|
|
| The eProcurement System of India enables the Tenderers to download the Tender Schedule free of cost and then submit the bids online through this portal. |
|
| |
|
|
| |
| 1. IV.11012/MW/CA-03/2026-27 |
IV.11012/MW/CA-03/2026-27 |
14-Apr-2026 12:00 PM |
15-Apr-2026 12:00 PM |
| 2. IV.11012/MW/CA-04/2026-27 |
IV.11012/MW/CA-04/2026-27 |
14-Apr-2026 12:00 PM |
15-Apr-2026 12:00 PM |
| 3. Performance Based Maintenance Contract Work of on Flexible and Rigid Pavement of Satna-Bela Section (Four Lane and Service Lane) Km 155/000 to 202/040 of NH-39 road (length 47.04 Km) in the State of Madhya Pradesh |
15/SAC/Tender/NH/Rewa/2025-26 |
23-Apr-2026 05:30 PM |
27-Apr-2026 12:30 PM |
| 4. Set Right of metering system against meter No GP-1001807 installed at Bungalow no. 5, Harish chand Mathur Lane (IQ), MTNL,New Delhi. |
EE(E)KBN/MTNL/2025-26/33 |
30-Mar-2026 03:00 PM |
01-Apr-2026 03:00 PM |
| 5. Supply of fresh Ration |
62 Dtd 19.03.26 |
14-Apr-2026 03:30 PM |
15-Apr-2026 04:30 PM |
| 6. LT/B440-003-WA-MR-3505/154 FOR PIPE-AS FOR Delayed Coker Unit (DCU) Revamp of Numaligarh Refinery Project |
LT/B440-003-WA-MR-3505/154 |
07-Apr-2026 12:00 PM |
08-Apr-2026 02:00 PM |
| 7. Repairing of Biotechnology dept. building, MU. |
No.389/2025-26/ENGG/MU/Civil |
01-Apr-2026 03:00 PM |
02-Apr-2026 03:00 PM |
| 8. Design, manufacturing, supply, installation and testing of bottom closure mechanism of MOG System of AVS Annex., NRB, BARC (T). |
BARC (T)/NRB/AVS Annex./Bottom closure/2026/ OPA- 402 |
01-Apr-2026 12:00 PM |
02-Apr-2026 03:00 PM |
| 9. Repairing of wall, plaster and painting of Chowkidar Qtr. Exam block and electric store room. |
No.331/2025-26/ENGG/MU/Civil |
01-Apr-2026 03:00 PM |
02-Apr-2026 03:00 PM |
| 10. Supply, Installation, Testing and Commissioning of Rheometer |
BHU/IOE/EQUIP/2025-26/02 |
24-Apr-2026 05:00 PM |
25-Apr-2026 03:00 PM |
|
|
|
| |
 |
|
|
|
| |
|
|
|
|
|
| Search with ID/Title/Reference no |
|
|
|