1 05-Jul-2025 10:00 AM 21-Jul-2025 02:30 PM 29-Jul-2025 03:00 PM [Non-Destructive Examination of various equipments and process piping at HWPK site during MTA-2025] [HWPK/MECH/ISI/MTA-2025/431A][2025_HWB_867494_1] Heavy Water Board||Heavy Water Plant Kota
2 05-Jul-2025 10:00 AM 21-Jul-2025 03:00 PM 29-Jul-2025 03:00 PM [HWPK/ELECT/2025/ MTA/35MVATr/201] [HWPK/ELECT/2025/ MTA/35MVATr/201][2025_HWB_867445_1] Heavy Water Board||Heavy Water Plant Kota
3 05-Jul-2025 10:00 AM 21-Jul-2025 03:00 PM 29-Jul-2025 03:00 PM [HWPK/ELECT/2025/MTA/DTR/206] [HWPK/ELECT/2025/MTA/DTR/206][2025_HWB_867464_1] Heavy Water Board||Heavy Water Plant Kota
4 03-Jul-2025 10:00 AM 18-Jul-2025 05:00 PM 23-Jul-2025 03:00 PM [Removal, shifting, re- installation of control valves and actuators (pneumatic and electric motor operated) of On-Off valves at HWPK site during MTA-2025.] [HWPK/INC/VALVEREM/MTA/2025/310][2025_HWB_867119_1] Heavy Water Board||Heavy Water Plant Kota
5 02-Jul-2025 10:00 AM 18-Jul-2025 02:30 PM 19-Jul-2025 03:30 PM [ Carrying out Quality and Pressure test of Thermic Fluid used in Reboilers.] [HWBF/TAL/LAB/2025/192][2025_HWB_866601_1] Heavy Water Board||Heavy Water Plant Talchar||Production Section - Talchar
6 02-Jul-2025 10:00 AM 10-Jul-2025 06:45 PM 17-Jul-2025 02:30 PM [Reconfiguration of RTU] [HWPM/EU/RTU/2025/02/NIT][2025_HWB_866099_1] Heavy Water Board||Heavy Water Plant Manuguru
7 01-Jul-2025 02:00 PM 16-Jul-2025 03:00 PM 19-Jul-2025 03:30 PM [Relocation of Server Room from Ground Floor to First Floor] [HWPT/INST/ACS/329/2025/IC][2025_HWB_866806_1] Heavy Water Board||Heavy Water Plant Tuticorin
8 01-Jul-2025 10:00 AM 01-Aug-2025 02:30 PM 05-Aug-2025 03:00 PM [Hydro Testing, Maintenance and Refilling of 6.5 Kg Cap. Carbon Dioxide CO2 type Fire Extinguisher Cylinders.] [HWPK/FIRE/2025/701][2025_HWB_866507_1] Heavy Water Board||Heavy Water Plant Kota
9 01-Jul-2025 10:00 AM 19-Jul-2025 03:30 PM 23-Jul-2025 03:30 PM [HWPT/Civil/Colony/07/2025] [HWPT/CIVIL/COLONY/07/2025][2025_HWB_866479_1] Heavy Water Board||Heavy Water Plant Tuticorin||Mechanical Section - Tuticorin
10 01-Jul-2025 10:00 AM 19-Jul-2025 03:30 PM 23-Jul-2025 03:30 PM [HWPT/Civil/Colony/08/2025] [HWPT/CIVIL/COLONY/08/2025][2025_HWB_866467_1] Heavy Water Board||Heavy Water Plant Tuticorin||Mechanical Section - Tuticorin
11 30-Jun-2025 11:00 AM 15-Jul-2025 06:00 PM 17-Jul-2025 03:00 PM [Supply of utility piping to process building of VDPP] [HWBF(V)/MECH/25-26/TS-495A][2025_HWB_866609_1] Heavy Water Board||Heavy Water Plant Baroda
12 30-Jun-2025 10:00 AM 14-Jul-2025 04:00 PM 18-Jul-2025 02:30 PM [Assistance in Operation and maintenance of HWPM colony hospital for a period of two years] [HWPM/MED/COL HOS/2025/01][2025_HWB_866560_1] Heavy Water Board||Heavy Water Plant Manuguru
13 27-Jun-2025 12:30 PM 10-Jul-2025 03:00 PM 11-Jul-2025 03:30 PM [Shifting of materials, fabrication, welding, machining of fittings at HWPT] [HWPT/ MECH/ 2025/1057][2025_HWB_866404_1] Heavy Water Board||Heavy Water Plant Tuticorin
14 26-Jun-2025 10:00 AM 15-Jul-2025 02:30 PM 21-Jul-2025 03:00 PM [Maintenance and Testing of Gate, Globe, Butterfly and Check Valves at HWPK during MTA -2025. ] [HWPK/MECH/MTA-2025/445][2025_HWB_866112_1] Heavy Water Board||Heavy Water Plant Kota
15 26-Jun-2025 10:00 AM 07-Jul-2025 06:00 PM 11-Jul-2025 02:30 PM [HWBFV/CIVIL/2025/02] [HWBFV/CIVIL/2025/02][2025_HWB_865941_1] Heavy Water Board||Heavy Water Plant Baroda
16 25-Jun-2025 10:00 AM 11-Jul-2025 03:00 PM 16-Jul-2025 03:30 PM [Pre-commissioning related works at HWP Tuticorin] [HWPT/MECH/2025/1054][2025_HWB_865332_1] Heavy Water Board||Heavy Water Plant Tuticorin
17 25-Jun-2025 10:00 AM 08-Jul-2025 04:00 PM 10-Jul-2025 02:30 PM [AMC Services for 2years for SO2/NO2 Analyzers at HWPM] [HWPM/I-P/SO2-NO2/2025][2025_HWB_865957_1] Heavy Water Board||Heavy Water Plant Manuguru
18 24-Jun-2025 10:00 AM 10-Jul-2025 02:30 PM 17-Jul-2025 03:00 PM [Non-destructive testing and related works of RCC and Steel Civil structures at Heavy Water Plant Kota.] [HWPK/ CIVIL/2024/110][2025_HWB_865631_1] Heavy Water Board||Heavy Water Plant Kota
19 24-Jun-2025 10:00 AM 10-Jul-2025 02:30 PM 17-Jul-2025 03:00 PM [Chemical Resistant Lining work at Heavy Water Plant (Kota).] [HWPK/ CIVIL/2025/106][2025_HWB_865639_1] Heavy Water Board||Heavy Water Plant Kota
20 24-Jun-2025 10:00 AM 10-Jul-2025 02:30 PM 17-Jul-2025 03:00 PM [Replacement of damaged Acid proof brick lining with civil repair works in old neutralization pit at HWPK.] [HWPK/ CIVIL/2025/108][2025_HWB_865642_1] Heavy Water Board||Heavy Water Plant Kota
21 23-Jun-2025 02:30 PM 07-Jul-2025 03:00 PM 12-Jul-2025 03:30 PM [Scaffolding erection works at HWP Tuticorin] [HWPT/MECH/2025/1056][2025_HWB_865722_1] Heavy Water Board||Heavy Water Plant Tuticorin
22 23-Jun-2025 12:30 PM 12-Jul-2025 02:30 PM 17-Jul-2025 03:00 PM [Annual rate contract for Maintenance of Pumps, Valve replacements, Flange joints, Heat Exchangers, maintenance work in round the clock shift, NDT works etc. at HWPK site] [HWPK/MECH/2025/449][2025_HWB_865683_1] Heavy Water Board||Heavy Water Plant Kota
23 23-Jun-2025 10:00 AM 09-Jul-2025 06:45 PM 16-Jul-2025 02:30 PM [Maintenance of Street Lights and PTLs in HWP(M) Colony.] [HWPM/Col/Elect/SLM/2025-27/NIT][2025_HWB_865607_1] Heavy Water Board||Heavy Water Plant Manuguru
24 23-Jun-2025 10:00 AM 11-Jul-2025 03:00 PM 18-Jul-2025 03:00 PM [HWPK/ELECT/2025/MTA/relay/209] [HWPK/ELECT/2025/MTA/relay/209][2025_HWB_865633_1] Heavy Water Board||Heavy Water Plant Kota
25 23-Jun-2025 09:00 AM 07-Jul-2025 06:00 PM 11-Jul-2025 02:30 PM [Repairs to fencing and up gradation of morcha at angle station and other civil works at ECHP kondapuram] [HWPM/CIVIL/CPP/NIT/2025/20][2025_HWB_865019_1] Heavy Water Board||Heavy Water Plant Manuguru
26 21-Jun-2025 10:00 AM 10-Jul-2025 02:30 PM 15-Jul-2025 03:00 PM [Removal, cleaning, inspection and refixing of tower sieve trays and internals of Exchange Unit and Distillation Unit Towers at HWP (Kota) site during MTA 2025] [HWPK/MECH/MTA-2025/440][2025_HWB_865501_1] Heavy Water Board||Heavy Water Plant Kota
27 18-Jun-2025 11:00 AM 07-Jul-2025 06:00 PM 10-Jul-2025 03:00 PM [Supply and installation of conventional earth pits at various locations at Heavy Water Plant Tuticorin] [HWPT/ELEC/MP/2025/Earth pits/182/NIT][2025_HWB_864749_1] Heavy Water Board||Heavy Water Plant Tuticorin
28 17-Jun-2025 10:00 AM 10-Jul-2025 02:30 PM 11-Jul-2025 03:30 PM [Servicing and Maintenance of Breathing Apparatus Sets (B.A. Sets) and supply and installation of spare parts of B.A. Sets at HWBF Talcher during 2025-26.] [HWBF/TAL/SE/2025/02][2025_HWB_864714_1] Heavy Water Board||Heavy Water Plant Talchar||Production Section - Talchar
29 16-Jun-2025 10:00 AM 08-Jul-2025 03:00 PM 11-Jul-2025 03:00 PM [HWPK/ELECT/2025/Col AMC/210] [HWPK/ELECT/2025/Col AMC/210][2025_HWB_864613_1] Heavy Water Board||Heavy Water Plant Kota
30 16-Jun-2025 09:00 AM 07-Jul-2025 06:00 PM 11-Jul-2025 02:30 PM [Repair of Pitching with toe wall near 4 pole structure on one side of drain in HWP Manuguru] [HWPM/CIVIL/MP/NIT/2025/19][2025_HWB_864423_1] Heavy Water Board||Heavy Water Plant Manuguru
31 14-Jun-2025 10:30 AM 08-Jul-2025 06:00 PM 14-Jul-2025 03:00 PM [Annual contract for piecemeal jobs on day to day basis in general shift and round the clock shift of HWBF vadodara] [HWBF/V/PROD/2025-26/2/KP-D/1][2025_HWB_864301_1] Heavy Water Board||Heavy Water Plant Baroda
32 11-Jun-2025 10:00 AM 11-Jul-2025 02:30 PM 17-Jul-2025 03:00 PM [Maintenance of lawns and gardens at HWP(K) Housing Colony for the year 2025-26.] [HWPK/ CIVIL/2025/105][2025_HWB_863894_1] Heavy Water Board||Heavy Water Plant Kota
33 11-Jun-2025 10:00 AM 10-Jul-2025 02:30 PM 16-Jul-2025 03:00 PM [Maintenance and testing of Large size DD valves covering sizes ranging from 12 inch NB- 36 inchNB at HWP (K) Site during MTA-2025.] [HWPK/MECH/2025/434][2025_HWB_863965_1] Heavy Water Board||Heavy Water Plant Kota
34 11-Jun-2025 10:00 AM 10-Jul-2025 02:30 PM 16-Jul-2025 03:00 PM [To assist in Carrying out Mechanical Maintenance Jobs of Utility Area of HWPK Plant Site and HWPK Colony WTP.] [HWPK/MECH/2025/448][2025_HWB_863541_1] Heavy Water Board||Heavy Water Plant Kota
35 06-Jun-2025 10:00 AM 09-Jul-2025 02:30 PM 17-Jul-2025 03:00 PM [FRP lining work in drain pits, valve pits and Atmospheric Degasser Sump at HWPK plant site] [HWPK/CIVIL/2025/104][2025_HWB_863294_1] Heavy Water Board||Heavy Water Plant Kota
36 05-Jun-2025 10:00 AM 07-Jul-2025 05:00 PM 12-Jul-2025 03:00 PM [Servicing, maintenance, testing and calibration of control valves during MTA-2025] [HWPK/INC/CV/MTA/ 2025/309][2025_HWB_863012_1] Heavy Water Board||Heavy Water Plant Kota
 