1 |
11-Jul-2025 05:25 PM |
11-Aug-2025 03:00 PM |
18-Aug-2025 03:00 PM |
[Engineering Consultant]
[BARC(V)/CES/LMPConsultant/183 dated 09.07.2025][2025_BARC_868545_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Visakhapatnam |
2 |
11-Jul-2025 05:00 PM |
05-Aug-2025 03:30 PM |
12-Aug-2025 03:00 PM |
[barbed wire fencing and laying of kutcha road]
[BARC(V)/CES/Fencing/182, Dated 10.07.2025][2025_BARC_868472_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Visakhapatnam |
3 |
11-Jul-2025 05:00 PM |
13-Aug-2025 03:30 PM |
21-Aug-2025 03:00 PM |
[Marine Geotechnical Investigation works at BARC Visakhapatnam]
[BARC(V)/CES/MarineGeotech/185 Dated 10.07.2025][2025_BARC_868505_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Visakhapatnam |
4 |
11-Jul-2025 11:00 AM |
29-Jul-2025 06:00 PM |
31-Jul-2025 03:00 PM |
[Dismantling and Removal of Non useful Non functional and Scrap Electrical Equipment and Items located in Cirus complex ]
[ BARC/RRMD/ET/3/2025-2026 Date 04/07/2025 ][2025_BARC_868309_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Reactor Group |
5 |
09-Jul-2025 03:00 PM |
04-Aug-2025 03:00 PM |
13-Aug-2025 03:30 PM |
[Annual maintenance contract for Aluminium doors, windows and miscellaneous works at various plants of INRPK during the year 2025-26.]
[BARCF/INRPK-MA/KA/TR/275/2025][2025_BARC_866857_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
6 |
09-Jul-2025 01:00 PM |
05-Aug-2025 06:00 PM |
07-Aug-2025 03:30 PM |
[Design supply installation laying testing and commissioning of 22kV E and 11kV E 3C 400Sqmm XLPE Armoured FRLS cables from 110kV SS to 22KV SS at BARC Trombay Mumbai 400085]
[BARC/TSD/ET/11/2025-26][2025_BARC_867873_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Technical Services Division |
7 |
08-Jul-2025 10:00 AM |
31-Jul-2025 06:00 PM |
05-Aug-2025 03:00 PM |
[Fabrication, supply, installation, testing and commissioning of SCADA for electrical system.]
[Fabrication, supply, installation, testing and commissioning of SCADA for electrical system ][2025_BARC_867413_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Nuclear Recycle Group |
8 |
08-Jul-2025 10:00 AM |
29-Jul-2025 03:00 PM |
08-Aug-2025 03:30 PM |
[Preventive Maintenance and annual load testing of MHEs at WIP, VWSF and UOF for the period of 2025-2026]
[BARCF/INRPK-MA/WM/TR/40/2025][2025_BARC_867706_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
9 |
07-Jul-2025 05:00 PM |
30-Jul-2025 03:00 PM |
04-Aug-2025 03:30 PM |
[Non destructive examination of Old Training School building, South site, BARC, Trombay Mumbai.]
[TENDER NOTICE No. BARC/CED/ET/19/2025-2026 Dated 02/07/2025][2025_BARC_867443_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
10 |
04-Jul-2025 03:00 PM |
08-Aug-2025 04:00 PM |
13-Aug-2025 03:30 PM |
[Construction of RCC tunnels, Precast pedestals for LLW Pipe line in FRFCF and BHAVINI Premises and other associated works at Kalpakkam]
[NRB/FRFCF/CIVIL/2025-2026/018][2025_BARC_866824_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
11 |
03-Jul-2025 02:00 PM |
24-Jul-2025 03:00 PM |
31-Jul-2025 03:30 PM |
[CS and SS Structural Fabrication and Equipment Installation for DDNP]
[BARCF/INRPK-MA/WM/TR/37/2025][2025_BARC_866476_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
12 |
02-Jul-2025 06:30 PM |
23-Jul-2025 03:00 PM |
25-Jul-2025 03:30 PM |
[Refurbishment of ENT, Physiotherapy, Audiometry and Psychiatric OPDs and other allied Civil, PH and Internal furnishing work at BARC Hospital Building, Anushaktinagar, Mumbai.]
[BARC/CSS/ET/14/2025-2026 DATE 30/06/2025][2025_BARC_866897_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
13 |
02-Jul-2025 05:00 PM |
18-Jul-2025 03:00 PM |
23-Jul-2025 03:30 PM |
[Health Assessment of civil structure of VDG Building namely Accelerator room, Control room, Gas handling room, Ion source room and other sea side buildings, North Site, BARC, Trombay, Mumbai]
[BARC/CED/ET/18/2025-2026 Date 30/06/2025][2025_BARC_866888_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
14 |
30-Jun-2025 05:00 PM |
23-Jul-2025 03:00 PM |
28-Jul-2025 03:30 PM |
[Refurbishment related to Civil and PH works of common toilets at Mod Labs and other buildings including miscellaneous Civil works of other areas, BARC, Trombay, Mumbai.]
[BARC/CED/ET/17/2025-2026 DATE 25/06/2025][2025_BARC_866440_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
15 |
27-Jun-2025 06:30 PM |
01-Aug-2025 03:00 PM |
05-Aug-2025 03:30 PM |
[Up-gradation related to civil works of AC plant and cooling tower area at BARC Hospital, internal furnishing works at BARC Hospital, NBH, Mod Lab dispensary and BARC dispensaries across Mumbai.]
[BARC/CSS/ET/13/2025-2026 DATE 26/06/2025][2025_BARC_866519_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
16 |
27-Jun-2025 06:00 PM |
04-Aug-2025 04:00 PM |
12-Aug-2025 02:00 PM |
[Detailed Engineering, Fabrication, Installation and Commissioning of Distributor headers, Connected piping system and Platform at BARC, Vizag ]
[BARC/RRDPD/ET/1/2025-2026][2025_BARC_866282_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Reactor Projects Group |
17 |
27-Jun-2025 05:00 PM |
01-Aug-2025 03:00 PM |
05-Aug-2025 03:30 PM |
[Construction of Overhead Water Tank and Onground Water Tank for P-1185 at RR Site, Kota, Rajasthan]
[BARC/CED/ET/16/2025-2026 Dated 25/06/2025][2025_BARC_866072_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
18 |
26-Jun-2025 03:00 PM |
18-Jul-2025 03:00 PM |
24-Jul-2025 03:30 PM |
[Electrification works for DUOSF, INRPK, Kalpakkam]
[BARCF/IN-M-EEI/WE/TR/16/2025][2025_BARC_866009_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
19 |
26-Jun-2025 02:00 PM |
17-Jul-2025 03:00 PM |
24-Jul-2025 03:30 PM |
[Technical Assistance for maintenance of mechanical equipment at WIP, ITF, VWSF and UOF, INRPK in General and RTC for the period 2025-2026]
[BARCF/INRPK-MA/WM/TR/36/2025][2025_BARC_865684_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
20 |
25-Jun-2025 05:30 PM |
01-Aug-2025 04:00 PM |
06-Aug-2025 03:00 PM |
[Supply, fabrication, assembly and installation of Stainless Steel equipments in Laundry area at WMP, FRFCF]
[BARC/NRB/FRFCF/WMP/ETR082/2025][2025_BARC_865942_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
21 |
25-Jun-2025 05:00 PM |
01-Aug-2025 03:00 PM |
05-Aug-2025 03:30 PM |
[External Structural repairs and Painting of TSH Building, Anushaktinagar, Mumbai-400094.]
[BARC/CSS/ET/12/2025-2026 Dated 13/06/2025][2025_BARC_865998_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
22 |
25-Jun-2025 04:00 PM |
24-Jul-2025 05:00 PM |
28-Jul-2025 03:30 PM |
[Plumbing Maintenance and water supply at PRPD Township, Anupuram]
[PRPD/NF-CE/ K -3047/2025][2025_BARC_866094_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam||PRPD |
23 |
25-Jun-2025 04:00 PM |
17-Jul-2025 04:00 PM |
23-Jul-2025 03:30 PM |
[Fabrication and Erection of RCC Hatch blocks, Stainless Steel Handrails for Staircases and Stainless Steel Cage ladder for RCC stack in WMP at FRFCF Project site at Kalpakkam]
[NRB/FRFCF/CIVIL/2025-2026/015][2025_BARC_865782_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
24 |
25-Jun-2025 03:00 PM |
14-Jul-2025 06:00 PM |
23-Jul-2025 03:30 PM |
[Design, Fabrication, Supply, Installation, Testing and Commissioning of PMCC/EPMCC, MCC/EMCC Panels and other associated Electrical works (Phase-I) at Building No. 503 in FRFCF, Kalpakkam]
[BARC/NRB/FRFCF/ELE/ETR064/2025][2025_BARC_865680_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
25 |
23-Jun-2025 03:00 PM |
21-Jul-2025 10:00 AM |
25-Jul-2025 02:00 PM |
[Replacement of MSBR Panels in Cirus, BARC ]
[BARC/RRMD/ET/1/2025-2026 Date 09/06/2025 ][2025_BARC_865095_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Reactor Group |
26 |
20-Jun-2025 10:00 AM |
21-Jul-2025 03:00 PM |
30-Jul-2025 03:30 PM |
[Supply, fabrication, installation and testing of off-gas piping for out-cell at WMP, FRFCF ]
[BARC/NRB/FRFCF/WMP/2025/001][2025_BARC_864986_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
27 |
18-Jun-2025 04:00 PM |
22-Jul-2025 04:00 PM |
31-Jul-2025 03:00 PM |
[Supply, Fabrication and Erection of SS304L and carbon steel Piping in Block 1 and 2 of FRP, FRFCF]
[BARC/NRB/FRFCF/FRP/ETR087/2025][2025_BARC_864680_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
28 |
11-Jun-2025 03:00 PM |
12-Jul-2025 03:00 PM |
22-Jul-2025 03:30 PM |
[Fabrication, supply, installation and testing of Transmitter racks with transmitters, Field Instruments and associated SS tubing, cabling and termination for HLW Partitioning Facility at North Bay of WIP, Kalpakkam]
[BARCF/IN-M-EEI/WE/TR/17/2025][2025_BARC_863767_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
29 |
04-Jun-2025 03:30 PM |
04-Aug-2025 03:30 PM |
20-Aug-2025 02:00 PM |
[Design, manufacture, supply, erection and testing at Factory and site of seismically qualified Electrically Operated Overhead Cranes in RUP, FRFCF, Kalpakkam]
[BARC/NRB/FRFCF/MHE/2025/092][2025_BARC_862994_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
30 |
04-Jun-2025 10:00 AM |
14-Jul-2025 03:00 PM |
30-Jul-2025 03:30 PM |
[SS 304L Instrumentation Impulse piping at Out-Cell of IL/OL and HLW Cells of WMP, FRFCF project]
[BARC/NRB/FRFCF/WMP/2025/106][2025_BARC_862911_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
31 |
29-May-2025 05:00 PM |
17-Jul-2025 03:00 PM |
23-Jul-2025 03:30 PM |
[Construction of retaining wall for P-1185 at RR Site, Kota, Rajasthan]
[BARC/CED/ET/10/2025-2026 Dated 23/05/2025][2025_BARC_861759_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
32 |
28-May-2025 02:00 PM |
16-Jul-2025 03:00 PM |
22-Jul-2025 03:00 PM |
[Construction of road network including foot paths, storm water drains, culverts, embankment pitching, kerb stones, street lighting and fencing at BARC-SMF Project, Challakere, Chitradurga, Karnataka.]
[BARC/SMFC/CS/03/2024-25/NIT][2025_BARC_861747_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre RMP Mysuru||Project SMFC Division |
33 |
28-May-2025 10:00 AM |
17-Jul-2025 03:00 PM |
21-Jul-2025 03:00 PM |
[Design, Engineering, Manufacturing/Fabrication, Supply, Installation, Erection, Testing Commissioning etc. of Utility systems, Utility Piping, Fire Fighting systems, Material Handling Equipment, Electrical, Control Instrumentation systems]
[BARC/SMFC/Utl/01/2025-26/NIT][2025_BARC_861822_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre RMP Mysuru||Project SMFC Division |
34 |
22-May-2025 05:00 PM |
17-Jul-2025 03:00 PM |
23-Jul-2025 03:00 PM |
[Finishing works of TL 123 at BARC, Visakhapatnam]
[BARC(V)/ CES/TL123/ Finishing/178 Dated 21.05.2025][2025_BARC_860993_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Visakhapatnam |
35 |
01-May-2025 05:00 PM |
17-Jul-2025 03:00 PM |
23-Jul-2025 03:00 PM |
[Construction of Engineering Hall-1 (Back-end facility for LWR - LLWMP)]
[BARC(V)/CES/EH01-LWR-LLWMP/180 Dated 30.04.2025][2025_BARC_858494_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Visakhapatnam |