1 |
03-Jul-2025 03:30 PM |
01-Aug-2025 04:00 PM |
02-Aug-2025 02:00 PM |
[PREPARATION, TRANSPORTATION AND FIXING OF FACADE -FLEX BOARD AT TAMIL NADU, PUDUCHERRY, TELANGANA, ANDHRA PRADESH, KARNATAKA, KERALA UNDER PRADHANMANTRI KISAN SAMRIDHI KENDRA - PMKSK]
[ESER/M AND D/PMKSK/010825/009 DATED 03.07.2025][2025_MFL_867254_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
2 |
03-Jul-2025 02:25 PM |
01-Aug-2025 04:00 PM |
04-Aug-2025 02:00 PM |
[PROCUREMENT OF VALVE SEAT (INDIGENOUS) FOR J241 A AND D PUMPS IN UREA PLANT ]
[EPRO/MM/VALVE SEAT/010825/114 DT.03.07.2025][2025_MFL_867245_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
3 |
02-Jul-2025 04:20 PM |
31-Jul-2025 04:00 PM |
01-Aug-2025 02:00 PM |
[PROCUREMENT OF STEAM PRESSURE CONTROL TO EVAPORATOR (MFL TAG PCV002) AND BOILER FEED PUMP STEAM INLET CONTROL VALVE]
[EPRO/MM/STEAM PRESSURE CONTROL/310725/113 DATED 02.07.2025][2025_MFL_867123_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
4 |
01-Jul-2025 04:25 PM |
30-Jul-2025 04:00 PM |
31-Jul-2025 02:00 PM |
[PROCUREMENT OF BAGGING CYLINDERS]
[EPRO/MM/BAGGING CYLINDERS/200525/053 DT21.04.2025][2025_MFL_866916_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
5 |
20-Jun-2025 04:10 PM |
21-Jul-2025 04:00 PM |
22-Jul-2025 02:00 PM |
[ANNUAL RATE CONTRACT FOR INSTRUMNTATION CABLE TRAY RENEWAL WORK AT MFL SITE]
[ESER/MAINT/CABLE TRAY RENEWAL/210725/022 DT. 20.06.2025][2025_MFL_865508_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
6 |
20-Jun-2025 03:30 PM |
21-Jul-2025 04:00 PM |
22-Jul-2025 02:00 PM |
[PROCUREMENT OF BUTTERFLY VALVE - SIZE. 36 INCH 900 MM]
[EPRO/MM/BUTTERFLY VALVE/210725/111][2025_MFL_865482_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
7 |
19-Jun-2025 04:45 PM |
18-Jul-2025 04:00 PM |
21-Jul-2025 02:00 PM |
[PROCUREMENT OF BELT, HEAT AND OIL RESISTANT HOR CONVEYOR]
[EPRO/MM/BELT HEAT OIL RESISTANT/180725/110 ][2025_MFL_865336_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
8 |
19-Jun-2025 04:10 PM |
09-Jul-2025 04:00 PM |
10-Jul-2025 02:00 PM |
[UNLOADING OF SPENT CATALYST IN 4 NOS OF TUBES AND LOADING OF NEW CATALYST IN 15 NOS OF TUBES IN PRIMARY REFORMER BY SPIRAL SPRING UNIDENSE METHOD]
[ESER/TS/PRI REF CATALYST UNLDNG AND LDNG/090725/002 DT. 19.06.2025][2025_MFL_865315_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
9 |
18-Jun-2025 01:00 PM |
17-Jul-2025 04:00 PM |
18-Jul-2025 02:00 PM |
[DISMANTLING, FABRICATION AND ERECTION OF UREA PRODUCT CONVEYOR O - 602 BASE STRUCTURE, GALLERY AND SUPPORTS IN TAR 2025]
[ESER/MAINT/O 602 CONVEYOR/170725/021][2025_MFL_865062_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
10 |
17-Jun-2025 04:00 PM |
16-Jul-2025 04:00 PM |
17-Jul-2025 02:00 PM |
[PROCUREMENT OF HYDRAZINE HYDRATE ]
[EPRO/MM/HYDRAZINE HYDRATE/160725/109][2025_MFL_864640_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
11 |
13-Jun-2025 04:15 PM |
14-Jul-2025 04:00 PM |
15-Jul-2025 02:00 PM |
[ PROCUREMENT OF PIPE CS AND SS 7 ITEMS ]
[EPRO/MM/PIPE CA AND SS-7I/140725/108 DATE 13-06-2025][2025_MFL_864542_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
12 |
12-Jun-2025 04:15 PM |
11-Jul-2025 04:00 PM |
14-Jul-2025 02:00 PM |
[PROCUREMENT AND INSTALLATION OF MOTOR CONTROL CENTRE FOR UREA PLANT]
[EPRO/MM/CONTROL CENTRE/110725/107 DATE 12-06-2025][2025_MFL_864339_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
13 |
12-Jun-2025 12:30 PM |
11-Jul-2025 04:00 PM |
14-Jul-2025 02:00 PM |
[REMOVAL OF EVAPORATOR E221 A AND B SHELL OLD CLADDING WITH PATCHES AND TO REINSTALL NEW CLADDING ALREADY ROLLED IN UREA PLANT DURING TAR 2025]
[ESER/MAINT/EVAPORATOR SHELL/110725/019][2025_MFL_864287_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
14 |
11-Jun-2025 04:45 PM |
10-Jul-2025 04:00 PM |
11-Jul-2025 02:00 PM |
[REPLACEMENT OF FABRIC TYPE EXPANSION JOINT ASSEMBLIES AT PRIMARY REFORMER BURNER LEVEL COMBUSTION AIR DUCTS IN AMMONIA PLANT DURING TAR 2025]
[ ESER/MAINT/REFORMER BELLOWS/100725/018][2025_MFL_864220_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
15 |
11-Jun-2025 03:05 PM |
10-Jul-2025 04:00 PM |
11-Jul-2025 02:00 PM |
[PROCUREMENT OF GAUGE PRESSURE TRANSMITTER]
[EPRO/MM/TRANSMITTER/100725/106 DATED 11.06.2025][2025_MFL_864179_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
16 |
09-Jun-2025 03:30 PM |
08-Jul-2025 04:00 PM |
09-Jul-2025 02:00 PM |
[RENEWAL OF CORRODED INTERCONNECTING CHANNEL SEGMENT AND MAIN BEAM PATCH-UP BENEATH THE NOZZLE FLOOR OF UREA PRILL TOWER IN UREA PLANT DURING TAR 2025]
[ESER/MAINT/NOZZLE FLOOR/080725/17][2025_MFL_863771_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
17 |
07-Jun-2025 11:45 AM |
07-Jul-2025 04:00 PM |
08-Jul-2025 02:00 PM |
[PROCUREMENT OF PIPE CARBON STEEL 3 ITEMS ]
[EPRO/MM/PIPE CARBON STEEL-3I/070725/105 DATE 07-06-2025][2025_MFL_863669_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
18 |
06-Jun-2025 04:10 PM |
05-Jul-2025 04:00 PM |
07-Jul-2025 02:00 PM |
[EXCHANGERS AND CONDENSERS OPENING FOR HYDRO - JET CLEANING, TUBE LEAK FIXING AND BOXING UP IN AMMONIA PLANT DURING TAR 2025]
[ESER/MAINT/EXCH AMMONIA/050725/016][2025_MFL_863563_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
19 |
06-Jun-2025 03:10 PM |
07-Jul-2025 04:00 PM |
08-Jul-2025 02:00 PM |
[PROCUREMENT OF THERMOCOLE SLAB 1000 Nos]
[EPRO/MM/THERMOCOLE SLAB/070725/104 DATED. 06.06.2025][2025_MFL_863512_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
20 |
05-Jun-2025 03:50 PM |
04-Jul-2025 04:00 PM |
07-Jul-2025 02:00 PM |
[PROCUREMENT OF GATE VALVE FLANGED - 3 ITEMS ]
[EPRO/MM/GATEVALVE FLANGED-3I/040725/103][2025_MFL_863364_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
21 |
31-May-2025 03:00 PM |
07-Jul-2025 04:00 PM |
08-Jul-2025 02:00 PM |
[PROCUREMENT OF END CAPS ASSEMBLY]
[EPRO/MM/END CAPS ASSEMBLY/300625/099 ][2025_MFL_862643_1]
|
Madras Fertilizers Limited||Materials Management - MFL |
22 |
29-May-2025 04:45 PM |
04-Jul-2025 04:00 PM |
07-Jul-2025 02:00 PM |
[PROCUREMENT OF SPARES FOR DRO PLANT - 1ST STAGE HP PUMP - 28 ITEMS]
[EPRO/MM/DRO PLANT HP PUMP/270625/084 ][2025_MFL_862321_1]
|
Madras Fertilizers Limited||Materials Management - MFL |