1 |
01-Jul-2025 06:55 PM |
21-Jul-2025 12:00 PM |
22-Jul-2025 02:00 PM |
[LT/B348-000-MF-MR-8001/131 - MEDIUM EXPANSION FOAM GENERATOR FOR BCPL]
[LT/B348-000-MF-MR-8001/131][2025_EIL_866663_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
2 |
01-Jul-2025 06:00 PM |
04-Jul-2025 02:00 PM |
04-Jul-2025 02:00 PM |
[INVITATION TO PRE-TENDER MEET FOR COMPOSITE WORKS FOR CONSTRUCTION OF STAGE (PHASE 2 AND 3) OF IIM NAGPUR CAMPUS]
[INVITATION TO PRE-TENDER MEET FOR COMPOSITE WORKS FOR CONSTRUCTION OF STAGE 1 OF IIM NAGPUR CAMPUS][2025_EIL_866973_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
3 |
01-Jul-2025 06:00 PM |
04-Jul-2025 12:00 PM |
04-Jul-2025 02:00 PM |
[INVITATION FOR PRE - TENDER MEET FOR HEAT EXCHANGER - PCHE OF PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES AT DAHEJ, GUJARAT OF M/S PETRONET LNG LIMITED]
[INVITATION FOR PRE-TENDER MEET FOR HEAT EXCHANGER - PCHE][2025_EIL_866967_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
4 |
01-Jul-2025 05:00 PM |
04-Jul-2025 11:00 AM |
04-Jul-2025 11:00 AM |
[INVITATION TO PRE-TENDER MEET CENTRIFUGAL GAS COMPRESSOR FOR BPCL, BINA PETCHEM AND REFINERY EXPANSION PROJECTS (BPREP) AT BINA REFINERY, MADHYA PRADESH (INDIA)]
[INVITATION TO PRE-TENDER MEET CENTRIFUGAL GAS COMPRESSOR][2025_EIL_866934_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
5 |
01-Jul-2025 04:00 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 02:00 PM |
[SKM/B224-000-EJ-T-0940/3044 MISCELLENOUS ELECTRICAL AND INSTRUMENTATION WORKS]
[SKM/B224-000-EJ-T-0940/3044][2025_EIL_856466_3]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
6 |
01-Jul-2025 02:30 PM |
04-Jul-2025 12:00 PM |
04-Jul-2025 02:30 PM |
[INVITATION TO PRE-TENDER MEETING FOR ROTARY LOBE PUMP FOR BIO ATF PROJECT, MRPL]
[INVITATION TO PRE-TENDER MEETING FOR ROTARY LOBE PUMP][2025_EIL_866885_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
7 |
01-Jul-2025 11:15 AM |
21-Jul-2025 12:00 PM |
21-Jul-2025 02:00 PM |
[EXPRESSION OF INTEREST FOR TECHNOLOGY LICENSORS FOR LICENSE AND TECHNOLOGY]
[8001-00-01-40-TS-01 Rev. No. 0][2025_EIL_854923_6]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
8 |
30-Jun-2025 06:55 PM |
04-Jul-2025 01:00 PM |
04-Jul-2025 03:00 PM |
[INVITATION TO PRE-TENDER MEETING FOR COMPOSITE WORKS-II FOR BUTENE-1, HPG-2, PSA UNIT AND OFFSITES AT BCPL LEPETKATA, ASSAM ]
[INVITATION TO PRE-TENDER MEETING FOR COMPOSITE WORKS-II FOR BUTENE-1, HPG-2, PSA UNIT AND OFFSITES ][2025_EIL_866750_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
9 |
30-Jun-2025 06:55 PM |
21-Jul-2025 12:00 PM |
22-Jul-2025 02:00 PM |
[LT/C132-000-JX-MR-6810/01 - DESALTER PACKAGE FOR EPCM, SUPPLY AND ASSOCIATED SERVICES FOR PHASE -2 REVAMP OF 2 STAGE DESALTER SYSTEM IN CDU 3 IN BPCL KOCHI REFINERY (BPCL)]
[LT/C132-000-JX-MR-6810/01][2025_EIL_866640_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
10 |
30-Jun-2025 06:50 PM |
28-Jul-2025 12:00 PM |
29-Jul-2025 02:00 PM |
[JP/B862-000-CI-T-8003/1019 CIVIL, STRUCTURAL AND UG WORKS INCLUDING PILING - PART-A, PART-B AND PART-C FOR PDH-PP PLANT WITH ETHANE AND PROPANE STORAGE AND HANDLING FACILITIES AT DAHEJ, GUJARAT OF M/s PETRONET LNG LIMITED (PLL) ]
[ JP/B862-000-CI-T-8003/1019][2025_EIL_866673_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
11 |
30-Jun-2025 03:00 PM |
03-Jul-2025 12:00 PM |
03-Jul-2025 02:00 PM |
[INVITATION TO PRE-TENDER MEET FOR COMPRESSOR-CENTRIFUGAL (SPP) (B957-300-KA-MR-5030) BINA PETCHEM AND REFINERY EXPANSION PROJECTS (BPREP) AT BINA REFINERY, MADHYA PRADESH (INDIA) OF M/s BPCL]
[INVITATION TO PRE-TENDER MEET FOR COMPRESSOR-CENTRIFUGAL (SPP)][2025_EIL_866670_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
12 |
27-Jun-2025 06:00 PM |
03-Jul-2025 09:00 AM |
03-Jul-2025 10:00 AM |
[INVITATION TO PRE-TENDER MEET FOR INFORMATION SYSTEM WORKS FOR ENTERPRISE COMPUTING AND CYBERSECURITY TRAINING INSTITUTE]
[ INVITATION TO PRE-TENDER MEET FOR INFORMATION SYSTEM WORKS][2025_EIL_866392_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
13 |
27-Jun-2025 05:00 PM |
14-Jul-2025 12:00 PM |
15-Jul-2025 02:00 PM |
[FACILITY MANAGEMENT CONTRACT (TECHNICAL) For EIL New Delhi-DC/ 8590-000-SE-T-1765/301 ]
[DC/ 8590-000-SE-T-1765/301][2025_EIL_866215_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
14 |
26-Jun-2025 06:00 PM |
10-Jul-2025 12:00 PM |
11-Jul-2025 02:00 PM |
[SUPPLY INSTALLATION TESTING AND COMMISSION OF AUTOMATIC ACCESS CONTROL SYSTEM AT EIL-DC/8590-000-SE-T-1771/303 ]
[DC/8590-000-SE-T-1771/303][2025_EIL_866082_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
15 |
25-Jun-2025 06:55 PM |
23-Jul-2025 12:00 PM |
24-Jul-2025 02:00 PM |
[JP/B862-000-CF-T-8201/1009 BUILDING TENDER I (NON-PLANT BUILDINGS) FOR PDH PP PLANT WITH ETHANE AND PROPANE STORAGE AND HANDLING FACILITIES AT DAHEJ, GUJARAT OF M/s PETRONET LNG LIMITED (PLL)]
[JP/B862-000-CF-T-8201/1009][2025_EIL_866164_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
16 |
25-Jun-2025 06:30 PM |
17-Jul-2025 12:00 PM |
18-Jul-2025 02:00 PM |
[JP/C098-000-CD-T-8104/1003 CONSTRUCTION OF BOUNDARY WALL AROUND THE SHRI RAM MANDIR COMPLEX IN AYODHYA]
[JP/C098-000-CD-T-8104/1003][2025_EIL_866008_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
17 |
25-Jun-2025 05:00 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 02:00 PM |
[REPLACEMENT OF RADIATOR CORE OF 625 KVA DG (2 Nos) INTALLED AT EIB CHENNAI]
[PM/8590-000-SE-T-1773/5147][2025_EIL_866088_1]
|
Engineers India Limited,MoPNG||RO Chennai Office,EIL,MoPNG |
18 |
25-Jun-2025 05:00 PM |
09-Jul-2025 12:00 PM |
10-Jul-2025 02:00 PM |
[Facility Management Contract -2 at EIB and Guest House at Asian Games Village New Delhi-DC/ 8590-000-SE-T-0994 /298]
[DC/ 8590-000-SE-T-0994 /298][2025_EIL_866003_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
19 |
25-Jun-2025 03:30 PM |
02-Jul-2025 03:00 PM |
02-Jul-2025 03:00 PM |
[ INVITATION TO PRE-TENDER MEETING FOR SUPPLY OF COLD FLOW FLUIDIZED BED FACILITY AT R AND D EIL GURUGRAM ]
[INVITATION TO PRE-TENDER MEETING FOR SUPPLY OF COLD FLOW FLUIDIZED BED FACILITY AT R AND D GURUGRAM][2025_EIL_866098_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
20 |
24-Jun-2025 06:00 PM |
15-Jul-2025 12:00 PM |
16-Jul-2025 12:00 PM |
[SG/B957-300-KA-MR-5140/15 - COMP-CENT.P.I.G(PIA) FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) FOR M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)]
[SG/B957-300-KA-MR-5140/15][2025_EIL_865914_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
21 |
24-Jun-2025 06:00 PM |
07-Jul-2025 12:00 PM |
08-Jul-2025 12:00 PM |
[SG/B933-011-PA-MR-5040/14 - DOMESTIC NOTICE FOR INVITATION FOR BIDS (IFB) PUMP-CENT. HOR. MULTISTAGE (SPP) FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP)]
[SG/B933-011-PA-MR-5040/14 ][2025_EIL_859783_2]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
22 |
24-Jun-2025 06:00 PM |
07-Jul-2025 12:00 PM |
08-Jul-2025 12:00 PM |
[SG/B933-011-PA-MR-5010/18 - PUMP-CENTRIFUGAL.HORZ. (SPECIAL PURPOSE PROCESS) FOR BINA PETCHEMAND REFINERY EXPANSION PROJECT (BPREP)]
[SG/B933-011-PA-MR-5010/18][2025_EIL_859785_2]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
23 |
23-Jun-2025 06:55 PM |
14-Jul-2025 12:00 PM |
15-Jul-2025 02:00 PM |
[LT/B348-000-YD-MR-1642/129 - GAS DETECTION SYSTEM FOR BCPL]
[LT/B348-000-YD-MR-1642/129][2025_EIL_865719_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
24 |
23-Jun-2025 06:55 PM |
14-Jul-2025 12:00 PM |
15-Jul-2025 02:00 PM |
[TANKAGE WORK]
[AKG/C068-000-MA-T-6001/1003][2025_EIL_865499_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
25 |
20-Jun-2025 06:55 PM |
04-Aug-2025 12:00 PM |
05-Aug-2025 02:00 PM |
[JP/B862-208-MD-T-4400/1017 FOR FLARE SYSTEM PACKAGE (DEMOUNTABLE TYPE) FOR PDH-PP PLANT WITH ETHANE AND PROPANE STORAGE AND HANDLING FACILITIES AT DAHEJ, GUJARAT OF M/s PETRONET LNG LIMITED (PLL)]
[JP/B862-208-MD-T-4400/1017][2025_EIL_865388_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
26 |
20-Jun-2025 05:10 PM |
04-Jul-2025 12:00 PM |
07-Jul-2025 12:00 PM |
[SG/B933-000-WA-MR-3001/42 - PIPE-CS-SMLS, WELDED AND IS-3589]
[SG/B933-000-WA-MR-3001/42][2025_EIL_865470_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
27 |
20-Jun-2025 03:30 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 02:00 PM |
[JP/B862-999-PB-T-8002/1011 - COOLING TOWER PACKAGE FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES AT DAHEJ, GUJARAT ]
[JP/B862-999-PB-T-8002/1011][2025_EIL_856358_2]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
28 |
19-Jun-2025 06:55 PM |
10-Jul-2025 12:00 PM |
11-Jul-2025 02:00 PM |
[JP/B862-101-EE-MR-6011/30 -HEAT EXCHANGER - LAS FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]
[JP/B862-101-EE-MR-6011/30][2025_EIL_865338_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
29 |
18-Jun-2025 06:55 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 02:00 PM |
[LT/B348-119-VV-MR-6014/130 - PRESSURE VESSELS-CARBON STEEL FOR BCPL]
[LT/B348-119-VV-MR-6014/130][2025_EIL_864813_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
30 |
18-Jun-2025 05:00 PM |
10-Jul-2025 12:00 PM |
11-Jul-2025 02:00 PM |
[REPAIR OF DATA CENTRE UPS AND ITS 3 YEARS CAMC ]
[PM/8589-000-SE-TN-1767/5145][2025_EIL_865025_1]
|
Engineers India Limited,MoPNG||RO Chennai Office,EIL,MoPNG |
31 |
18-Jun-2025 02:00 PM |
02-Jul-2025 12:00 PM |
03-Jul-2025 02:00 PM |
[JP/C118-000-PN-T-8711/1001 ENVIRONMENTAL BASELINE DATA COLLECTION FOR IOCL HALDIA REFINERY]
[JP/C118-000-PN-T-8711/1001][2025_EIL_864806_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
32 |
17-Jun-2025 04:00 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 02:00 PM |
[JP/B933-999-CJ-T-8202/1011 FOR BUILDING MODIFICATION WORK OF BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)]
[JP/B933-999-CJ-T-8202/1011][2025_EIL_864903_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
33 |
17-Jun-2025 12:00 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 02:00 PM |
[LT/B440-003-VV-MR-6017/141 - PRESSURE VESSEL -CS (Up to 25mm) for DCU Revamp Project , NRL]
[LT/B440-003-VV-MR-6017/141][2025_EIL_863070_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
34 |
13-Jun-2025 06:55 PM |
07-Jul-2025 12:00 PM |
08-Jul-2025 02:00 PM |
[JP/B862-101-PM-T-6002/1012 CCR PACKAGE FOR PDH PP PLANT WITH ETHANE AND PROPANE STORAGE AND HANDLING FACILITIES AT DAHEJ, GUJARAT]
[JP/B862-101-PM-T-6002/1012][2025_EIL_856186_2]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
35 |
13-Jun-2025 06:55 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 02:00 PM |
[LAYING OF ETP DISCHARGE PIPELINE AT PARADIP]
[MK/B302-000-MK-T-9524/1032][2025_EIL_860990_2]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
36 |
13-Jun-2025 05:00 PM |
04-Jul-2025 12:00 PM |
07-Jul-2025 02:00 PM |
[JP/B862-101-KA-MR-5060/506 - COMP - ROT. SCREW(PS) FOR PDH PP PLANT WITH ETHANE AND]
[JP/B862-101-KA-MR-5060/506][2025_EIL_843709_2]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
37 |
13-Jun-2025 04:20 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 02:00 PM |
[JP/B224-000-MD-MR-5720/16 EMERGENCY DG PACKAGE FOR RAJASTHAN REFINERY PROJECT (RRP) OF HRRL, BARMER, RAJASTHAN, INDIA ]
[JP/B224-000-MD-MR-5720/16][2025_EIL_864526_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
38 |
13-Jun-2025 04:00 PM |
04-Jul-2025 12:00 PM |
07-Jul-2025 12:00 PM |
[SG/B933-000-WF-MR-3012/27 - GASKET]
[SG/B933-000-WF-MR-3012/27][2025_EIL_864443_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
39 |
11-Jun-2025 06:55 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 02:00 PM |
[LT/B440-003-EJ-T-0010/1013 - ELECTRICAL AND INSTRUMENTATION WORKS FOR DCU REVAMP PROJECT OF M/S NUMALIGARH REFINERY LIMITED]
[LT/B440-003-EJ-T-0010/1013][2025_EIL_864177_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
40 |
11-Jun-2025 09:00 AM |
10-Jul-2025 12:00 PM |
11-Jul-2025 02:00 PM |
[JP/B862-000-CF-T-8202/1020 BUILDING TENDER-II PLANT BUILDINGS- PART-A AND PART-B FOR PDH-PP PLANT WITH ETHANE AND PROPANE STORAGE AND HANDLING FACILITIES AT DAHEJ GUJARAT OF M/s PETRONET LNG LIMITED (PLL) ]
[JP/B862-000-CF-T-8202/1020][2025_EIL_863986_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
41 |
10-Jun-2025 06:00 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 02:00 PM |
[LT/C050-000-CA-T-8001/1002 - TOPOGRAPHY SURVEY FOR POLYPROPYLENE UNIT (PPU) PROJECT OF M/S NUMALIGARH REFINERY LIMITED (NRL)]
[LT/C050-000-CA-T-8001/1002][2025_EIL_860154_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
42 |
10-Jun-2025 06:00 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 02:00 PM |
[LT/C050-000-CB-T-8101/1001 - GEO TECHNICAL INVESTIGATION OF POLYPROPYLENE UNIT (PPU) PROJECT OF M/S NUMALIGARH REFINERY LIMITED (NRL) ]
[LT/C050-000-CB-T-8101/1001][2025_EIL_859829_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
43 |
09-Jun-2025 06:55 PM |
07-Jul-2025 12:00 PM |
08-Jul-2025 02:00 PM |
[LT/B440-003-XT-MR-0240/142 - MV POWER AND CONTROL CABLES FOR Delayed Coker Unit (DCU) Revamp Project of Numaligarh Refinery Limited ]
[LT/B440-003-XT-MR-0240/142][2025_EIL_863161_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
44 |
09-Jun-2025 06:55 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 12:00 PM |
[SG/B933-016-LZ-MR-4540/22 - AUTOMATIC BACKWASH TYPE FILTER FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP)]
[SG/B933-016-LZ-MR-4540/22][2025_EIL_862657_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
45 |
09-Jun-2025 06:30 PM |
24-Jul-2025 12:00 PM |
25-Jul-2025 02:00 PM |
[JP/B862-000-EB-T-0020/1021 - 220 KV GAS INSULATED SUBSTATION PACKAGE FOR PDH-PP PLANT WITH ETHANE AND PROPANE STORAGE AND HANDLING FACILITIES AT DAHEJ, GUJARAT OF M/s PETRONET LNG LIMITED (PLL)]
[JP/B862-000-EB-T-0020/1021][2025_EIL_863682_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
46 |
06-Jun-2025 06:55 PM |
21-Jul-2025 12:00 PM |
22-Jul-2025 02:00 PM |
[JP/B862-000-PF-T-4350/1018 - COMPRESSED AIR AND CRYOGENIC NITROGEN PLANT PACKAGE FOR PDH-PP PLANT WITH ETHANE AND PROPANE STORAGE AND HANDLING FACILITIES AT DAHEJ, GUJARAT OF M/s PETRONET LNG LIMITED (PLL)]
[JP/B862-000-PF-T-4350/1018][2025_EIL_863074_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
47 |
05-Jun-2025 05:20 PM |
21-Jul-2025 12:00 PM |
22-Jul-2025 02:00 PM |
[JP/B862-102-LZ-MR-4040/513 - BAGGING AND PALLETIZING PACKAGE FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT OF PETRONET LNG LIMITED, DAHEJ (GUJARAT)]
[JP/B862-102-LZ-MR-4040/513][2025_EIL_863309_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
48 |
05-Jun-2025 04:20 PM |
04-Jul-2025 12:00 PM |
07-Jul-2025 02:00 PM |
[JP/B862-000-WA-MR-3002/25 - PIPES - 3L PE COATED FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT AT DAHEJ, GUJARAT]
[JP/B862-000-WA-MR-3002/25][2025_EIL_863346_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
49 |
04-Jun-2025 06:55 PM |
02-Jul-2025 12:00 PM |
03-Jul-2025 02:00 PM |
[JP/B653-000-MP-T-9510/1006 HOT TAPPING WORKS PART-A AND PART-B FOR REVAMPING OF SV STATIONS, GAS TERMINAL AND KRIBCHO TERMINAL (PART-B) AT ONGC HAZIRA PLANT]
[JP/B653-000-MP-T-9510/1006][2025_EIL_863179_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
50 |
02-Jun-2025 06:55 PM |
07-Jul-2025 12:00 PM |
08-Jul-2025 02:00 PM |
[LT/B440-003-WL-MR-3156/131 - SAMPLING SYSTEM FOR DCU REVAMP PROJECT OF M/S NUMALIGARH REFINERY LIMITED ]
[LT/B440-003-WL-MR-3156/131][2025_EIL_860479_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
51 |
02-Jun-2025 06:20 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 02:00 PM |
[JP/B862-101-CC-MR-6018/20 - COLUMN - CS and SS FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT OF PETRONET LNG LIMITED, DAHEJ (GUJARAT)]
[JP/B862-101-CC-MR-6018/20][2025_EIL_862831_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
52 |
30-May-2025 06:55 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[SG B933-016-LZ-MR-5401/11) - DOMESTIC NOTICE FOR INVITATION FOR BIDS (IFB) FOR HPRT-ELECTRIC GENERATOR PACKAGE FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) ]
[SG/B933-016-LZ-MR-5401/11 ][2025_EIL_859782_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
53 |
30-May-2025 06:20 PM |
10-Jul-2025 12:00 PM |
11-Jul-2025 02:00 PM |
[JP/B862-000-YE-MR-2540/27 - CLOSED CIRCUIT TV FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES AT DAHEJ, GUJARAT OF M/s PETRONET LNG LIMITED (PLL)]
[JP/B862-000-YE-MR-2540/27][2025_EIL_862456_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
54 |
29-May-2025 06:55 PM |
10-Jul-2025 12:00 PM |
11-Jul-2025 12:00 PM |
[JP/B933-011-MC-T-7401/1010 CDU HEATER (NEW) AND VDU HEATER (REVAMP) PACKAGE OF BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP)]
[JP/B933-011-MC-T-7401/1010][2025_EIL_862317_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
55 |
27-May-2025 04:00 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 02:00 PM |
[SS/B895-0IF-PA-MR-5280/10 - PUMP-CENTRIFUGAL, HORIZONTAL (SPP)]
[SS/B895-0IF-PA-MR-5280/10][2025_EIL_861398_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
56 |
23-May-2025 06:55 PM |
07-Jul-2025 12:00 PM |
08-Jul-2025 02:00 PM |
[JP/B862-204-PD-T-8701/1016 - WATER BLOCK PACKAGE (RWTP, RODMP, CPU AND ETP) FOR PDH PP PLANT WITH ETHANE AND PROPANE STORAGE AND HANDLING FACILITIES AT DAHEJ, GUJARAT OF M/s PETRONET LNG LIMITED (PLL)]
[JP/B862-204-PD-T-8701/1016][2025_EIL_860752_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
57 |
21-May-2025 02:00 PM |
10-Jul-2025 12:00 PM |
11-Jul-2025 12:00 PM |
[JP/B957-540-CV-T-8201/1018 POLYMER WAREHOUSE PACKAGE FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)]
[JP/B957-540-CV-T-8201/1018][2025_EIL_860819_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
58 |
20-May-2025 06:55 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[JP/B957-500-MB-T-6600/1017 - SPHERE PACKAGE OF BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)]
[JP/B957-500-MB-T-6600/1017][2025_EIL_860788_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
59 |
19-May-2025 06:00 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 02:00 PM |
[Site Grading works and Const.of Boundary Wall for CBG Plant DC/ 7715-000-CQ-T-8002 /7]
[DC/ 7715-000-CQ-T-8002 /7][2025_EIL_860318_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
60 |
16-May-2025 06:00 PM |
02-Jul-2025 12:00 PM |
03-Jul-2025 12:00 PM |
[SG/B957-300-CC-MR-6002/10 - PRESSURE VESSEL-CS SITE FABRICATED, COLUMN-CS SITE FABRICATED FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL) ]
[SG/B957-300-CC-MR-6002/10][2025_EIL_860323_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
61 |
14-May-2025 04:00 PM |
16-Jul-2025 12:00 PM |
17-Jul-2025 02:00 PM |
[LT/C106-000-LA-T-8501/01/EOI - EOI FOR TECHNOLOGY LICENSING FOR METHYL AMINE PLANT FOR NUMALIGARH REFINERY LIMITED (NRL), INDIA ]
[LT/C106-000-LA-T-8501/01/EOI][2025_EIL_859932_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
62 |
13-May-2025 06:15 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 02:00 PM |
[JP/B862-101-EX-MR-6013/515 - FEED DRIER REGENERANT VAPORIZER (BAYONET TYPE) FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT OF PETRONET LNG LIMITED, DAHEJ (GUJARAT)]
[JP/B862-101-EX-MR-6013/515][2025_EIL_859832_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
63 |
09-May-2025 09:00 AM |
07-Jul-2025 12:00 PM |
08-Jul-2025 02:00 PM |
[JP/B862-201-PG-T-7490/1015 - STEAM GENERATION SYSTEM PACKAGE FOR PDH PP PLANT WITH ETHANE AND PROPANE STORAGE AND HANDLING FACILITIES AT DAHEJ, GUJARAT OF M/s PETRONET LNG LIMITED (PLL)]
[JP/B862-201-PG-T-7490/1015][2025_EIL_859199_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
64 |
08-May-2025 10:10 AM |
31-Jul-2025 12:00 PM |
01-Aug-2025 02:00 PM |
[Guaranteed Parmeters for AKG/C068-000-EP-T-9501/1001]
[AKG/C068-000-EP-T-9501/1001 (Guaranted Parameters)][2025_EIL_855621_2]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
65 |
08-May-2025 10:00 AM |
31-Jul-2025 12:00 PM |
01-Aug-2025 02:00 PM |
[EPCC PACKAGE FOR SDA AND IHCD FOR LMBU PROJECT]
[AKG/C068-000-EP-T-9501/1001][2025_EIL_855578_2]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
66 |
02-May-2025 09:00 AM |
04-Jul-2025 12:00 PM |
07-Jul-2025 12:00 PM |
[JP/B957-999-PD-T-8701/1014 - WATER BLOCK PACKAGE CONSISTING OF RWTP, RODMP AND ZLDP OF BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP) ]
[JP/B957-999-PD-T-8701/1014][2025_EIL_858453_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
67 |
25-Apr-2025 09:00 AM |
15-Jul-2025 12:00 PM |
16-Jul-2025 02:00 PM |
[JP/B862-102-PL-T-4100/1014 AUTOMATIC STORAGE AND RETRIEVAL SYSTEM (AS/RS) PACKAGE FOR PDH-PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES AT DAHEJ, GUJARAT OF M/s PETRONET LNG LIMITED (PLL)]
[JP/B862-102-PL-T-4100/1014][2025_EIL_857697_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
68 |
23-Apr-2025 03:00 PM |
14-Jul-2025 12:00 PM |
15-Jul-2025 02:00 PM |
[APPOINTMENT OF LEGAL ADVISOR FOR SETTING-UP OF CBG PLANT AT AMBALA]
[APPOINTMENT OF LEGAL ADVISOR FOR SETTING-UP OF CBG PLANT AT AMBALA][2024_EIL_831023_4]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
69 |
23-Apr-2025 03:00 PM |
14-Jul-2025 12:00 PM |
15-Jul-2025 02:00 PM |
[APPOINTMENT OF PROJECT FINANCIAL ADVISOR (PFA) FOR SETTING UP OF CBG PLANT AT AMBALA]
[APPPOINTMENT OF PROJECT FINANCIAL ADVISOR (PFA) FOR SETTING UP OF CBG PLANT AT AMBALA][2024_EIL_830963_4]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
70 |
19-Apr-2025 09:00 AM |
22-Jul-2025 12:00 PM |
23-Jul-2025 02:00 PM |
[JP/B862-102-PM-T-9500/1013 EPC TENDER FOR PP UPSTREAM OF POWDER SECTION FOR PDH-PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES AT DAHEJ, GUJARAT OF M/s PETRONET LNG LIMITED (PLL)]
[JP/B862-102-PM-T-9500/1013][2025_EIL_857119_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
71 |
04-Apr-2025 09:00 AM |
10-Jul-2025 12:00 PM |
11-Jul-2025 02:00 PM |
[JP/B933-423-PT-T-8701/1006 CONDENSATE POLISHING UNIT (CPU) PACKAGE FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP) BINA OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)]
[JP/B933-423-PT-T-8701/1006][2025_EIL_855543_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
72 |
28-Mar-2025 06:30 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[JP/B957-420-PG-T-7410/1009 - STEAM GENERATION PACKAGE FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)]
[JP/B957-420-PG-T-7410/1009][2025_EIL_854765_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
73 |
27-Mar-2025 06:55 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 02:00 PM |
[SELECTION OF PMIS SOLUTION AND SI FOR IMPLEMENTATION IN EIL]
[SELECTION OF PMIS SOLUTION AND SI FOR IMPLEMENTATION IN EIL ][2025_EIL_852922_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
74 |
13-Mar-2025 05:00 PM |
09-Sep-2025 12:00 PM |
10-Sep-2025 02:00 PM |
[Expression of Interest (EOI) for Enlistment of Architects for Infrastructure Projects]
[Expression of Interest (EOI) for Enlistment of Architects][2025_EIL_853232_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
75 |
07-Mar-2025 02:00 PM |
08-Jul-2025 12:00 PM |
09-Jul-2025 12:00 PM |
[JP/B925-000-EP-T-9801/1001 - EPCC PACKAGE OF POLYPROPYLENE AND BUTENE-1 UNIT OF BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)]
[JP/B925-000-EP-T-9801/1001][2025_EIL_851595_2]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |
76 |
13-Feb-2025 09:00 AM |
10-Jul-2025 12:00 PM |
11-Jul-2025 12:00 PM |
[JP/B957-000-EB-T-0020/1004 - 220kV GIS PACKAGE FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)]
[JP/B957-000-EB-T-0020/1004][2025_EIL_844926_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG |