|
The eProcurement System of India enables the Tenderers to download the Tender Schedule free of cost and then submit the bids online through this portal. |
|
|
|
| |
1. Painting works at CIFT Residential Complex, Thevara |
1-2/2025-EM |
06-Oct-2025 09:00 AM |
07-Oct-2025 09:00 AM |
2. INVITATION TO PRE-TENDER MEETING FOR POWER RECOVERY EXPANDER GENERATOR PACKAGE FOR Bharat Petroleum Corporation Ltd. (BPCL) - Kochi Refinery |
INVITATION TO PRE-TENDER MEETING FOR POWER RECOVERY EXPANDER GENERATOR PACKAGE FOR (BPCL) - Kochi |
23-Sep-2025 11:00 AM |
24-Sep-2025 11:00 AM |
3. PROCUREMENT OF BUCKET FOR UREA ELEVATOR 100 Nos |
EPRO/MM/BUCKET FOR UREA ELEVATOR/161025/176 DATED 17.09.2025 |
16-Oct-2025 04:00 PM |
17-Oct-2025 02:00 PM |
4. External repair and painting of few blocks constructed in different phases at Anushakti Abasan 1AF, Bidhannagar, Kolkata 64 |
VECC/MEG/ESD/CMS/NIT/T-1918/ 1875 Date 15.09.2025 |
03-Oct-2025 05:00 PM |
06-Oct-2025 11:00 AM |
5. Development of Infrastructure for Tourism at Navadra Lighthouse |
CM-JM-02011/1/2025-Civil |
29-Sep-2025 03:00 PM |
30-Sep-2025 04:00 PM |
6. CE.T.42/2025 Making Storage Slots GWSD |
CE.T.42/2025 Making Storage Slots GWSD |
07-Oct-2025 03:00 PM |
08-Oct-2025 03:00 PM |
7. Upgradation of existing 40 MT capacity lorry weighbridge into 60 MT by way ofSupply,Installation,Testing Commissioning of fully electronic computerized lorry weighbridge 60 MTcapacity lorry weighbridge onturnkey basis at FSDBijapur for the FY 2025-26 |
14/2025-26 |
27-Sep-2025 02:30 PM |
29-Sep-2025 03:00 PM |
8. Supply and Installation of Trimble Real Works Software at NITTTR Campus, Chennai |
NITTTR/SP/2025-26/0165 |
08-Oct-2025 04:00 PM |
09-Oct-2025 04:00 PM |
9. Providing and laying GI pipeline from Gate No. 3 Road Junction to Directors Lodge, East Campus and HDPE Pipeline (STP line Extension) from Vindhayachal Hostel to Satpura Hostel, west Campus at IIT Delhi. |
IITD/WORKS (SP- 5114)/2025 |
25-Sep-2025 03:00 PM |
26-Sep-2025 03:00 PM |
10. Supply, Installation, Testing and Commissioning of 60MT capacity fully electronic computerized lorry weighbridge (with Cabin) on turnkey basis by demolishing the existing 40 MT ELWB-II at FSD Bellary for the FY 2025-26. |
15/2025-26 |
27-Sep-2025 02:30 PM |
29-Sep-2025 03:00 PM |
|
|
|
|
 |
|
|
|
|
|
|
Search with ID/Title/Reference no |
|
|
|