1 |
02-Jul-2025 06:30 PM |
23-Jul-2025 03:00 PM |
25-Jul-2025 03:30 PM |
[Refurbishment of ENT, Physiotherapy, Audiometry and Psychiatric OPDs and other allied Civil, PH and Internal furnishing work at BARC Hospital Building, Anushaktinagar, Mumbai.]
[BARC/CSS/ET/14/2025-2026 DATE 30/06/2025][2025_BARC_866897_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
2 |
02-Jul-2025 05:00 PM |
18-Jul-2025 03:00 PM |
23-Jul-2025 03:30 PM |
[Health Assessment of civil structure of VDG Building namely Accelerator room, Control room, Gas handling room, Ion source room and other sea side buildings, North Site, BARC, Trombay, Mumbai]
[BARC/CED/ET/18/2025-2026 Date 30/06/2025][2025_BARC_866888_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
3 |
30-Jun-2025 05:00 PM |
23-Jul-2025 03:00 PM |
28-Jul-2025 03:30 PM |
[Refurbishment related to Civil and PH works of common toilets at Mod Labs and other buildings including miscellaneous Civil works of other areas, BARC, Trombay, Mumbai.]
[BARC/CED/ET/17/2025-2026 DATE 25/06/2025][2025_BARC_866440_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
4 |
27-Jun-2025 06:30 PM |
01-Aug-2025 03:00 PM |
05-Aug-2025 03:30 PM |
[Up-gradation related to civil works of AC plant and cooling tower area at BARC Hospital, internal furnishing works at BARC Hospital, NBH, Mod Lab dispensary and BARC dispensaries across Mumbai.]
[BARC/CSS/ET/13/2025-2026 DATE 26/06/2025][2025_BARC_866519_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
5 |
27-Jun-2025 06:00 PM |
04-Aug-2025 04:00 PM |
12-Aug-2025 02:00 PM |
[Detailed Engineering, Fabrication, Installation and Commissioning of Distributor headers, Connected piping system and Platform at BARC, Vizag ]
[BARC/RRDPD/ET/1/2025-2026][2025_BARC_866282_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Reactor Projects Group |
6 |
27-Jun-2025 05:00 PM |
01-Aug-2025 03:00 PM |
05-Aug-2025 03:30 PM |
[Construction of Overhead Water Tank and Onground Water Tank for P-1185 at RR Site, Kota, Rajasthan]
[BARC/CED/ET/16/2025-2026 Dated 25/06/2025][2025_BARC_866072_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
7 |
27-Jun-2025 04:30 PM |
11-Jul-2025 04:00 PM |
15-Jul-2025 11:30 AM |
[Refurbishment of Change room]
[BARC/FRD/ET/3/2025-2026][2025_BARC_866484_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Nuclear Recycle Group |
8 |
27-Jun-2025 09:00 AM |
07-Jul-2025 04:30 PM |
11-Jul-2025 03:00 PM |
[Preventive Maintenance of Utility and MHE systems at MPDD for year 2025-26]
[BARCF/MPDD/ME/TR/17/2025][2025_BARC_864783_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
9 |
26-Jun-2025 05:30 PM |
10-Jul-2025 03:00 PM |
16-Jul-2025 03:30 PM |
[Analytical and Supporting works in Process Control Laboratory of CWMF, INRPK]
[BARCF/INRPK-LA/CW/TR/6/2025][2025_BARC_865792_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
10 |
26-Jun-2025 03:00 PM |
18-Jul-2025 03:00 PM |
24-Jul-2025 03:30 PM |
[Electrification works for DUOSF, INRPK, Kalpakkam]
[BARCF/IN-M-EEI/WE/TR/16/2025][2025_BARC_866009_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
11 |
26-Jun-2025 02:00 PM |
17-Jul-2025 03:00 PM |
24-Jul-2025 03:30 PM |
[Technical Assistance for maintenance of mechanical equipment at WIP, ITF, VWSF and UOF, INRPK in General and RTC for the period 2025-2026]
[BARCF/INRPK-MA/WM/TR/36/2025][2025_BARC_865684_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
12 |
25-Jun-2025 05:30 PM |
01-Aug-2025 04:00 PM |
06-Aug-2025 03:00 PM |
[Supply, fabrication, assembly and installation of Stainless Steel equipments in Laundry area at WMP, FRFCF]
[BARC/NRB/FRFCF/WMP/ETR082/2025][2025_BARC_865942_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
13 |
25-Jun-2025 05:00 PM |
01-Aug-2025 03:00 PM |
05-Aug-2025 03:30 PM |
[External Structural repairs and Painting of TSH Building, Anushaktinagar, Mumbai-400094.]
[BARC/CSS/ET/12/2025-2026 Dated 13/06/2025][2025_BARC_865998_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
14 |
25-Jun-2025 04:00 PM |
08-Jul-2025 03:00 PM |
11-Jul-2025 03:30 PM |
[Plumbing Maintenance and water supply at PRPD Township, Anupuram]
[PRPD/NF-CE/ K -3047/2025][2025_BARC_866094_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam||PRPD |
15 |
25-Jun-2025 04:00 PM |
17-Jul-2025 04:00 PM |
23-Jul-2025 03:30 PM |
[Fabrication and Erection of RCC Hatch blocks, Stainless Steel Handrails for Staircases and Stainless Steel Cage ladder for RCC stack in WMP at FRFCF Project site at Kalpakkam]
[NRB/FRFCF/CIVIL/2025-2026/015][2025_BARC_865782_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
16 |
25-Jun-2025 03:00 PM |
14-Jul-2025 06:00 PM |
23-Jul-2025 03:30 PM |
[Design, Fabrication, Supply, Installation, Testing and Commissioning of PMCC/EPMCC, MCC/EMCC Panels and other associated Electrical works (Phase-I) at Building No. 503 in FRFCF, Kalpakkam]
[BARC/NRB/FRFCF/ELE/ETR064/2025][2025_BARC_865680_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
17 |
24-Jun-2025 03:00 PM |
08-Jul-2025 03:00 PM |
09-Jul-2025 03:30 PM |
[Construction of Air Supply building and Storage building for SWPB of CWMF, BARCF at Kalpakkam]
[BARCF/INR-PRJ/CI/TR/9/2025][2025_BARC_865557_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
18 |
23-Jun-2025 03:00 PM |
21-Jul-2025 10:00 AM |
25-Jul-2025 02:00 PM |
[Replacement of MSBR Panels in Cirus, BARC ]
[BARC/RRMD/ET/1/2025-2026 Date 09/06/2025 ][2025_BARC_865095_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Reactor Group |
19 |
20-Jun-2025 10:00 AM |
21-Jul-2025 03:00 PM |
30-Jul-2025 03:30 PM |
[Supply, fabrication, installation and testing of off-gas piping for out-cell at WMP, FRFCF ]
[BARC/NRB/FRFCF/WMP/2025/001][2025_BARC_864986_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
20 |
19-Jun-2025 03:00 PM |
10-Jul-2025 03:00 PM |
17-Jul-2025 03:30 PM |
[Providing Technical assistance for Maintenance of Instrumentation systems in KARP-II]
[BARCF/IN-M-EEI/KE/TR/21/2025][2025_BARC_863331_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
21 |
18-Jun-2025 05:30 PM |
08-Jul-2025 03:00 PM |
15-Jul-2025 03:30 PM |
[FABRICATION AND ERECTION OF MS AND SS STRUCTURAL WITH ASSOCIATED EQUIPMENT ERECTION FOR HLW PRETREATMENT CELL OF WIP, INRPK]
[BARCF/INR-PRJ/ME/TR/27/2025][2025_BARC_863768_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
22 |
18-Jun-2025 04:00 PM |
22-Jul-2025 04:00 PM |
31-Jul-2025 03:00 PM |
[Supply, Fabrication and Erection of SS304L and carbon steel Piping in Block 1 and 2 of FRP, FRFCF]
[BARC/NRB/FRFCF/FRP/ETR087/2025][2025_BARC_864680_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
23 |
18-Jun-2025 10:00 AM |
08-Jul-2025 03:00 PM |
14-Jul-2025 02:00 PM |
[Structural Civil Repairs in Critical Facility Reactor complex]
[BARC/RRMD/ET/2/2025-2026 Date 09/06/2025][2025_BARC_864929_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Reactor Group |
24 |
17-Jun-2025 01:00 PM |
09-Jul-2025 06:00 PM |
14-Jul-2025 03:30 PM |
[BARC/TSD/ET/8/2025-2026]
[BARC/TSD/ET/8/2025-2026][2025_BARC_864818_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Technical Services Division |
25 |
13-Jun-2025 05:30 PM |
04-Jul-2025 05:00 PM |
11-Jul-2025 03:30 PM |
[Fabrication, Inspection, Supply, assembly, Installation and Leak testing in train configuratin of glove-boxes made up of 6mm thick stainless steel (304L) plate of per the technical specification and drawings at FRFCF, NRB, Kalpakkam.]
[BARC/NRB/FRFCF/FRP/ETR100/2025][2025_BARC_864508_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
26 |
11-Jun-2025 03:00 PM |
12-Jul-2025 03:00 PM |
22-Jul-2025 03:30 PM |
[Fabrication, supply, installation and testing of Transmitter racks with transmitters, Field Instruments and associated SS tubing, cabling and termination for HLW Partitioning Facility at North Bay of WIP, Kalpakkam]
[BARCF/IN-M-EEI/WE/TR/17/2025][2025_BARC_863767_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
27 |
06-Jun-2025 04:00 PM |
04-Jul-2025 03:00 PM |
14-Jul-2025 03:00 PM |
[Supply, fabrication, installation and testing of Negative Pressure System at WMP, FRFCF]
[BARC/NRB/FRFCF/WMP/2025/091][2025_BARC_863349_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
28 |
04-Jun-2025 03:30 PM |
10-Jul-2025 03:30 PM |
23-Jul-2025 02:00 PM |
[Design, manufacture, supply, erection and testing at Factory and site of seismically qualified Electrically Operated Overhead Cranes in RUP, FRFCF, Kalpakkam]
[BARC/NRB/FRFCF/MHE/2025/092][2025_BARC_862994_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
29 |
04-Jun-2025 10:00 AM |
04-Jul-2025 03:00 PM |
16-Jul-2025 03:30 PM |
[SS 304L Instrumentation Impulse piping at Out-Cell of IL/OL and HLW Cells of WMP, FRFCF project]
[BARC/NRB/FRFCF/WMP/2025/106][2025_BARC_862911_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
30 |
02-Jun-2025 04:55 PM |
11-Jul-2025 03:30 PM |
18-Jul-2025 03:00 PM |
[BARC(V)/CES/Geotech/181 Dated 02.06.2025]
[BARC(V)/CES/Geotech/181 Dated 02.06.2025][2025_BARC_862803_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Visakhapatnam |
31 |
29-May-2025 05:00 PM |
07-Jul-2025 03:00 PM |
11-Jul-2025 03:30 PM |
[Construction of retaining wall for P-1185 at RR Site, Kota, Rajasthan]
[BARC/CED/ET/10/2025-2026 Dated 23/05/2025][2025_BARC_861759_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
32 |
28-May-2025 04:00 PM |
10-Jul-2025 03:30 PM |
23-Jul-2025 11:00 AM |
[Supply, Fabrication and Installation of SS Equipment, structural members along with SS304L Piping from building 401 to 503 of FRFCF Project]
[BARC/NRB/FRFCF/FRP/ETR070/2025][2025_BARC_861691_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Kalpakkam |
33 |
28-May-2025 02:00 PM |
04-Jul-2025 03:00 PM |
09-Jul-2025 03:00 PM |
[Construction of road network including foot paths, storm water drains, culverts, embankment pitching, kerb stones, street lighting and fencing at BARC-SMF Project, Challakere, Chitradurga, Karnataka.]
[BARC/SMFC/CS/03/2024-25/NIT][2025_BARC_861747_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre RMP Mysuru||Project SMFC Division |
34 |
28-May-2025 10:00 AM |
17-Jul-2025 03:00 PM |
21-Jul-2025 03:00 PM |
[Design, Engineering, Manufacturing/Fabrication, Supply, Installation, Erection, Testing Commissioning etc. of Utility systems, Utility Piping, Fire Fighting systems, Material Handling Equipment, Electrical, Control Instrumentation systems]
[BARC/SMFC/Utl/01/2025-26/NIT][2025_BARC_861822_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre RMP Mysuru||Project SMFC Division |
35 |
26-May-2025 05:00 PM |
07-Jul-2025 03:00 PM |
10-Jul-2025 03:30 PM |
[Composite upgradation work of Conference room, Exhibition hall and Entrance lobby of FIPLY building including Civil, Electrical, Mechanical, Audio Video, Physical protection system and miscellaneous civil works of sea side buildings, North Site, BARC]
[BARC/CED/ET/9/2025-2026 Dated 23/05/2025 ][2025_BARC_861632_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division |
36 |
22-May-2025 05:00 PM |
07-Jul-2025 03:00 PM |
11-Jul-2025 03:00 PM |
[Finishing works of TL 123 at BARC, Visakhapatnam]
[BARC(V)/ CES/TL123/ Finishing/178 Dated 21.05.2025][2025_BARC_860993_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Visakhapatnam |
37 |
01-May-2025 05:00 PM |
07-Jul-2025 03:00 PM |
14-Jul-2025 03:00 PM |
[Construction of Engineering Hall-1 (Back-end facility for LWR - LLWMP)]
[BARC(V)/CES/EH01-LWR-LLWMP/180 Dated 30.04.2025][2025_BARC_858494_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Visakhapatnam |