41. |
20-May-2025 06:55 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[JP/B957-500-MB-T-6600/1017 - SPHERE PACKAGE OF BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)]
[JP/B957-500-MB-T-6600/1017][2025_EIL_860788_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG
|
42. |
13-Jun-2025 04:20 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 02:00 PM |
[JP/B224-000-MD-MR-5720/16 EMERGENCY DG PACKAGE FOR RAJASTHAN REFINERY PROJECT (RRP) OF HRRL, BARMER, RAJASTHAN, INDIA ]
[JP/B224-000-MD-MR-5720/16][2025_EIL_864526_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG
|
43. |
20-Jun-2025 05:45 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:30 PM |
[MALDI-TOF System]
[TMH/MUZ/2025-2026/CPU/EO/0004][2025_TMC_865568_1]
|
Tata Memorial Centre||Tata Memorial Hospital Mumbai
|
44. |
26-Jun-2025 11:15 AM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[Provn of roof replacement existing 02 OR living bk Bldg No T0105C T6510B of Bn HQ of 31 Assam Rifles at Changlang ]
[VIII.11013/Engr/MW/2025-26/08][2025_ARMHA_866210_1]
|
Assam Rifles - MHA
|
45. |
27-Jun-2025 09:30 AM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[External repairing and re-painting of 01 no block Type-II qtr (Block No. 11) at 207 CoBRA CRPF, Medinipur, (WB)]
[B-V(207 CoBRA)/2025-26-CZ-C/Cell (TE-11) ][2025_CRPF_866226_1]
|
DG,CRPF,MHA||Central Zone,CRPF,MHA||Central Zone HQRS,CRPF,MHA
|
46. |
27-Jun-2025 09:30 AM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[Repair of shelves, racks, almirah, granite and tile work of 405 Men barrack No. 01 and 02 at RTC CRPF, Rajgir, Bihar]
[B-V(RTC Rajgir)/2025-26-CZ-C/Cell (TE-12) ][2025_CRPF_866228_1]
|
DG,CRPF,MHA||Central Zone,CRPF,MHA||Central Zone HQRS,CRPF,MHA
|
47. |
26-Jun-2025 01:15 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[Provn of repair of floor of existing accns Bldg Nos T8411B T8311A T8311B T8411C T8411E of COB Khimyong of 31 Assam Rifles]
[VIII.11013/Engr/MW/2025-26/10][2025_ARMHA_866250_1]
|
Assam Rifles - MHA
|
48. |
26-Jun-2025 12:50 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[Provn of roof replacement of existing 02 x Single JCOs accns Bldg Nos T0905G T7510B and JCOs Club Bldg No T1704 of Bn HQ of 31 Assam Rifles at Changlang]
[VIII.11013/Engr/MW/2025-26/09][2025_ARMHA_866236_1]
|
Assam Rifles - MHA
|
49. |
13-Jun-2025 12:30 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[Repair work in Laboratory in the 3rd floor of the Department of Physics, Academic building-VI, maintenance and allied works in Animal House, two nos. aluminium door replacement in Geography Department, and 7 nos. doors replacement (5 Iron and 2 PVC) ]
[TU/Eng Cell/civil/maintc/10/2025-2026 ][2025_TU_864461_1]
|
Tripura University
|
50. |
13-Jun-2025 06:55 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 02:00 PM |
[LAYING OF ETP DISCHARGE PIPELINE AT PARADIP]
[MK/B302-000-MK-T-9524/1032][2025_EIL_860990_2]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG
|