1 |
20-May-2024 05:00 PM |
10-Jun-2024 05:00 PM |
15-Jun-2024 11:00 AM |
[Providing footpath along internal road from main gate to Line Division Office at Old Colony of Loktak Project, Manipur.]
[NH-LPS-HOP013(12)/3/2024-CD I and III/1040][2024_NHPC_808047_1]
|
NHPC Limited||Loktak power station-NHPC |
2 |
20-May-2024 11:30 AM |
10-Jun-2024 11:30 AM |
13-Jun-2024 11:30 AM |
[Repair and pre-mix carpeting of Right Embankment Road (from HR Bridge to RD 2200 m) at Tanakpur Barrage]
[NH/TPS/PnC/NIT/2024 /E115665/1019/89 dt 18/05/2024][2024_NHPC_807945_1]
|
NHPC Limited||Tanakpur Power Station-NHPC |
3 |
18-May-2024 05:30 PM |
08-Jun-2024 05:30 PM |
14-Jun-2024 11:30 AM |
[Supply, Installation, Testing and commissioning of 02 nos. 800 Amps Air Circuit Breaker (ACB) including accessories and Restoration of automation system of WBSEDCL I/C and DG AMF panel of O and M Unit-II Office, Kolkata]
[NH/RO(Slg)/ PR15323/44][2024_NHPC_807781_1]
|
NHPC Limited||Siliguri Region Office-NHPC |
4 |
18-May-2024 11:30 AM |
08-Jun-2024 11:30 AM |
11-Jun-2024 11:30 AM |
[Repair of Right Embankment between RD (plus/minus) 900 m to RD (plus/minus) 1270 m and Pitching on Slopes between RD (plus/minus) 700 m to RD (plus/minus) 1270 m at Tanakpur Barrage site]
[NH/TPS/PnC/NIT/2024 /E115546/1020/87 dt 17/05/2024][2024_NHPC_807728_1]
|
NHPC Limited||Tanakpur Power Station-NHPC |
5 |
18-May-2024 10:00 AM |
07-Jun-2024 05:00 PM |
11-Jun-2024 11:30 AM |
[Repair and dry cleaning work of furniture installed in the administrative building located in Sector 31A of Regional Office Chandigarh and transit camp, field hostel, guest house located in Sector 42A, Sector-43A and Sector 35A.]
[NH/ROCHD/PNC/CW11/2024/18 ][2024_NHPC_807715_1]
|
NHPC Limited||Regional Office Chandigarh-NHPC |
6 |
17-May-2024 06:30 PM |
28-Jun-2024 05:30 PM |
03-Jul-2024 11:30 AM |
[EPC Contract for Design, Engineering, Supply, Construction, Erection Testing and Commissioning of 200 MW Grid connected Solar PV Power Project in GSECL RE Solar Park at Khavda (Stage-3) Gujarat with Comprehensive Operation and Maintenance for 5 yrs]
[NH/CCW/CC-I/CO-312/PR16924/1 dated 18.04.2024][2024_NHPC_805733_1]
|
NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC |
7 |
17-May-2024 10:00 AM |
06-Jun-2024 03:00 PM |
10-Jun-2024 03:30 PM |
[Painting and Repairing Work of Valve House, Cable Trench at Switchyard, New DG Building and Switchyard Control Room at Baira Siul Power Station]
[NH/BSPS/CC/CW/04/2024-25/81][2024_NHPC_807641_1]
|
NHPC Limited||Bairasiul Power Station-NHPC |
8 |
16-May-2024 11:30 AM |
06-Jun-2024 11:30 AM |
10-Jun-2024 11:30 AM |
[Providing vitrified tiles flooring and improvements of washrooms at Sharda shadan FH TPS Banbasa]
[NH/TPS/PnC/NIT/2024 /E108202/1015/82 dt 15/05/2024][2024_NHPC_807499_1]
|
NHPC Limited||Tanakpur Power Station-NHPC |
9 |
15-May-2024 06:00 PM |
05-Jun-2024 05:30 PM |
11-Jun-2024 04:00 PM |
[Repair and maintenance of existing Old water supply GI PIPE Line at Balutar colony Right bank NHPC Teesta V Power Station]
[NH/TSV/Cont/CC-324/NIT-915][2024_NHPC_807471_1]
|
NHPC Limited||Teesta-V Power Station-NHPC |
10 |
15-May-2024 03:00 PM |
30-May-2024 03:00 PM |
08-Jun-2024 03:00 PM |
[Replacement of existing conventional Electro-Mechanical Hoisting Mechanism with Hydraulic Motor Drive Mechanism of Surge Shaft Gate No.2 of Dhauliganga Power Station]
[NH/DG/Contract/1041/2024-25/17 Dated 15/05/2024][2024_NHPC_807427_1]
|
NHPC Limited||Dhauliganga Power Station-NHPC |
11 |
15-May-2024 03:00 PM |
05-Jun-2024 05:30 PM |
11-Jun-2024 04:00 PM |
[Supplying Erection Testing and Commissioning of Electrical and Mechanical works and construction of Civil works for 90 KLD sewage treatment plant STP for NHPC Teesta V Right Bank Colony Balutar]
[NH/TSV/Cont/CC-323/NIT-914][2024_NHPC_807388_1]
|
NHPC Limited||Teesta-V Power Station-NHPC |
12 |
15-May-2024 09:55 AM |
30-May-2024 05:30 PM |
01-Jun-2024 04:00 PM |
[Paver block work in front of administrative building of Chutak Power Station, Kargil (Work Reserved for Project Affected Families (PAFs) and local bidders from District Kargil)]
[2024_NHPC ][2024_NHPC_807338_1]
|
NHPC Limited||Chutak Power Station-NHPC |
13 |
14-May-2024 03:00 PM |
05-Jun-2024 05:30 PM |
12-Jun-2024 04:00 PM |
[Supply, installation, Testing and commissioning of Horizontal centrifugal axially split case pump with suitable motor an frame and Starter cum control panel with mandatory spares and Pipeline with accessories an Bus bar chamber with Main switch ]
[NH/TSV/CONT/MC-146/NIT-913][2024_NHPC_807176_1]
|
NHPC Limited||Teesta-V Power Station-NHPC |
14 |
13-May-2024 06:55 PM |
27-May-2024 03:00 PM |
28-May-2024 03:00 PM |
[Service, repair and maintenance contract of Package/DuctableACs installed at Power House and Colony]
[NH/CPS-1/PnC/W-1447/2024-25/23 Dated 03/05/2024][2024_NHPC_805991_2]
|
NHPC Limited||Chamera Power Station-I-NHPC |
15 |
13-May-2024 06:00 PM |
03-Jun-2024 05:00 PM |
06-Jun-2024 04:00 PM |
[Exploratory Drifts Work of size 1.8 m (W) X 2.1 m (H) of rectangular section at Power house site of Kamala HE Project, Arunachal Pradesh]
[NH/KHEP/PNC/NIT/2024/103][2024_NHPC_807061_1]
|
NHPC Limited||ED Region Siang/Tawang/Dibang-NHPC |
16 |
13-May-2024 11:30 AM |
03-Jun-2024 11:30 AM |
06-Jun-2024 11:30 AM |
[Filling of cavity in Right Guide bund by lean concrete grade 1/2/4 at TPS Barrage]
[NH/TPS/PnC/NIT/2024 /E118003/1017/76 dt 11/05/2024][2024_NHPC_806976_1]
|
NHPC Limited||Tanakpur Power Station-NHPC |
17 |
11-May-2024 10:00 AM |
01-Jun-2024 05:00 PM |
07-Jun-2024 03:00 PM |
[Repair of Drains, Tiles, Flooring etc. of Field Hostel-1 to Field Hostel -4, Old B-type and Old C-Type Buildings in Township of Kishanganga Power Station, Bandipora, J and K (PKG-482).]
[NH/KG/PnC/TS/PKG-482/2024][2024_NHPC_806820_1]
|
NHPC Limited||Kishanganga Project-NHPC |
18 |
10-May-2024 05:00 PM |
24-May-2024 05:00 PM |
27-May-2024 03:00 PM |
[Repair and painting of Nursery School building at CPS 1 Khairi]
[NH/CPS-1/PnC/W-1449/2024-25/79 Dated- 10/05/2024][2024_NHPC_806795_1]
|
NHPC Limited||Chamera Power Station-I-NHPC |
19 |
10-May-2024 01:00 PM |
31-May-2024 05:00 PM |
04-Jun-2024 05:00 PM |
[Replacement of cover plate of Cable Channel and Repair at Switch Yard area of Sewa-II Power Station Mashka,(JK) (CW-618)]
[NH/Sewa2/Cont/CW618/NIT-03/339 Dt.09.05.24 ][2024_NHPC_806636_1]
|
NHPC Limited||Sewa Power Station-NHPC |
20 |
10-May-2024 10:00 AM |
30-May-2024 05:00 PM |
06-Jun-2024 04:00 PM |
[Providing protection work near power intake of Uri-II Power Station, JK]
[NH/Uri-II/CnP/24-25/113][2024_NHPC_806710_1]
|
NHPC Limited||Uri-II Power Station-NHPC |
21 |
07-May-2024 06:00 PM |
22-May-2024 03:00 PM |
27-May-2024 03:30 PM |
[Procurement, Installation, Commissioning and Maintenance work of Early Warning System (EWS)]
[NH/TLD-IV PS/W-914/2024/934 ][2024_NHPC_806366_1]
|
NHPC Limited||Teesta Low Dam Project Stage IV-NHPC |
22 |
07-May-2024 05:30 PM |
22-May-2024 05:30 PM |
28-May-2024 11:30 AM |
[Providing Security and surveillance Services at Liaison Office, Kolkata, NHPC Ltd., for the period of 24 months]
[NH/RO-SLG/C/NIT-01/2024-2025/ ][2024_NHPC_806380_1]
|
NHPC Limited||Siliguri Region Office-NHPC |
23 |
07-May-2024 10:00 AM |
27-May-2024 03:00 PM |
31-May-2024 03:30 PM |
[Repair, Maintenance, Flushing and Revival of Twin Tube Piezometer at Baira Dam]
[NH/BSPS/CC/CW/01/2024-25/75][2024_NHPC_806263_1]
|
NHPC Limited||Bairasiul Power Station-NHPC |
24 |
06-May-2024 05:00 PM |
27-May-2024 06:55 PM |
01-Jun-2024 03:00 PM |
[Supply Installation and Annual maintenance of LED Display board at Nagwain, Parbati HE Project (Stage-II)(Package No. C-741)]
[NH/PP-II/PnC/Pkg. No. C-741/2024][2024_NHPC_806100_1]
|
NHPC Limited||Parbati II Project-NHPC |
25 |
04-May-2024 05:00 PM |
25-May-2024 06:55 PM |
31-May-2024 03:00 PM |
[Repair of Jigrai Trench Weir surface at Jigrai Nallah site of Parbati H.E. Project (Stage-II), (Package No-C-749)]
[NH/PP-II/PnC/Pkg. No. C-749/2024][2024_NHPC_805995_1]
|
NHPC Limited||Parbati II Project-NHPC |
26 |
04-May-2024 11:00 AM |
25-May-2024 11:00 AM |
28-May-2024 11:00 AM |
[Construction work of breast wall near the fallen tower near Chudi Bridge of Chamera-III Power Station (Pkg.No. PHC3-04) ]
[NH/CPS- III/Cont./PHC3-04/2024-25/ 49][2024_NHPC_806029_1]
|
NHPC Limited||Chamera-III Power Station-NHPC |
27 |
02-May-2024 10:00 AM |
22-May-2024 03:00 PM |
27-May-2024 03:30 PM |
[Carrying out Annual Maintenance and Repair of underwater parts of three Generating Units of 3X60 MW of BSPS]
[NH/BSPS/CC/PH/03/2024-25/66][2024_NHPC_805488_1]
|
NHPC Limited||Bairasiul Power Station-NHPC |
28 |
30-Apr-2024 06:55 PM |
21-May-2024 06:55 PM |
27-May-2024 03:00 PM |
[Replacement of Wooden Flooring of Badminton Court of Community Hall/Multipurpose Hall at Nagwain Township of Parbati-H.E. Project (Stage-II), (Package No-C-748)]
[NH/PP-II/PnC/Pkg. No. C-748/2024][2024_NHPC_805509_1]
|
NHPC Limited||Parbati II Project-NHPC |
29 |
29-Apr-2024 10:00 AM |
21-May-2024 05:00 PM |
29-May-2024 04:00 PM |
[NH/Uri-II/CnP/24-25/112]
[NH/Uri-II/CnP/24-25/112 ][2024_NHPC_805275_1]
|
NHPC Limited||Uri-II Power Station-NHPC |
30 |
29-Apr-2024 10:00 AM |
21-May-2024 05:00 PM |
29-May-2024 04:00 PM |
[Supply and Installation of anti-corrosive coating and Thermal lagging of cooling water pipe line at Uri-II Power House]
[NH/Uri-II/CnP/24-25/111][2024_NHPC_805274_1]
|
NHPC Limited||Uri-II Power Station-NHPC |
31 |
26-Apr-2024 05:00 PM |
07-Jun-2024 05:30 PM |
12-Jun-2024 11:30 AM |
[Sale of Power from 50 MW Wind Power Project, Jaisalmer]
[NH/CCW/CC-I/CO-307/PR60823/10 ][2024_NHPC_804799_1]
|
NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC |
32 |
25-Apr-2024 12:05 PM |
24-May-2024 03:00 PM |
29-May-2024 03:00 PM |
[Supply and Installation of Dewatering Pump Motor set along with pipe, valves, fitting etc. of Power House at Nimoo Bazgo PS, Alchi, Leh.]
[NBPS/CnP/2024-25/W-03/217][2024_NHPC_804928_1]
|
NHPC Limited||Nimoo Bazgo Power Station-NHPC |
33 |
24-Apr-2024 05:30 PM |
22-May-2024 03:00 PM |
27-May-2024 03:00 PM |
[Repair of Dam Gallery of Nimoo Bazgo Power Station.]
[NBPS/CnP/2024-25/W-02/216 ][2024_NHPC_804441_1]
|
NHPC Limited||Nimoo Bazgo Power Station-NHPC |
34 |
23-Apr-2024 11:30 AM |
21-May-2024 11:30 AM |
24-May-2024 11:30 AM |
[Repair and Painting of A-type and B-type quarters at TPS Banbasa]
[NH/TPS/PnC/NIT/202 /E108197/1014/33 dt 22/04/2024][2024_NHPC_804607_1]
|
NHPC Limited||Tanakpur Power Station-NHPC |
35 |
20-Apr-2024 05:00 PM |
22-May-2024 05:00 PM |
27-May-2024 11:00 AM |
[Repairing of Water Supply System in Old Colony and New Colony of Loktak Project.]
[NH-LPS-CDIV/5/2023-CIVIL/1038][2024_NHPC_804464_1]
|
NHPC Limited||Loktak power station-NHPC |
36 |
19-Apr-2024 06:00 PM |
29-May-2024 05:00 PM |
03-Jun-2024 03:00 PM |
[Repair and Overhauling of four (04) numbers Aqua Make 150 HP Drainage / Dewatering Submersible pumps of TLD-IV Power Station]
[NH/TLD-IV PS/P and C/W-906/2024/ 889 ][2024_NHPC_804362_1]
|
NHPC Limited||Teesta Low Dam Project Stage IV-NHPC |
37 |
18-Apr-2024 11:00 AM |
23-May-2024 05:00 PM |
29-May-2024 03:00 PM |
[Restoration of Damaged Left Bank Sainj Suind Road between RD 567 (U/s) to RD 1284 (D/s) and boundary wall of CISF Camp, Sallah of Parbati-III Power Station]
[PR11923/281/1 Damaged Left Bank Sainj Suind Road ][2024_NHPC_804165_1]
|
NHPC Limited||Parbati III Power Station-NHPC |
38 |
10-Apr-2024 06:30 PM |
22-May-2024 05:00 PM |
27-May-2024 03:30 PM |
[Lot- 5B Package for Hydro-Mechanical Works for Intake and Draft Tube Gates and Hoists of Dibang Multipurpose Project, 2880 MW , located in Lower Dibang Valley District in the State of Arunachal Pradesh, India]
[NH/CCW/CCIII/CO310/PR12923/177][2024_NHPC_803559_1]
|
NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC |
39 |
09-Apr-2024 03:00 PM |
24-May-2024 05:30 PM |
29-May-2024 04:00 PM |
[Protection work for strengthening basement footing of lattice pole structures of NHPC 11KV Balutar Dikchu Transmission line of Teesta V Power Station]
[NH/TSV/Cont/CC-322/NIT-911][2024_NHPC_803386_1]
|
NHPC Limited||Teesta-V Power Station-NHPC |
40 |
09-Apr-2024 02:00 PM |
21-May-2024 05:00 PM |
25-May-2024 03:30 PM |
[Repairing of 02 Nos Multistage case booster pump WL 100/4 and 02 Nos 3 (Three) Phase induction motor 170 HP (125 KW) at Shalimar Pumping Station at DPS Kishtwar]
[NH/DPS/CONT/NIT-184/2024/ E112876 dated 09.04.2024][2024_NHPC_803358_1]
|
NHPC Limited||Dulhasti Power Station-NHPC |
41 |
27-Mar-2024 03:00 PM |
23-May-2024 05:30 PM |
30-May-2024 04:00 PM |
[Upgradation of SCADA System at Teesta-V Power Station- Ensuring Efficiency and Security]
[NH/TSV/Cont/EC-150/NIT-908][2024_NHPC_802327_1]
|
NHPC Limited||Teesta-V Power Station-NHPC |
42 |
19-Mar-2024 05:00 PM |
30-May-2024 06:55 PM |
05-Jun-2024 03:00 PM |
[Upgradation of Feedback system of Main Inlet Valve (MIV) and Brake Jet Valve (BJV) at Power House of Parbati HE Project (Stage-II)(Package-C-743).]
[NH/PP-II/PnC/Pkg. No. C-743/2024][2024_NHPC_801493_1]
|
NHPC Limited||Parbati II Project-NHPC |
43 |
15-Mar-2024 06:00 PM |
24-May-2024 05:30 PM |
29-May-2024 11:30 AM |
[Selection of RE Power Developers For Supply of 1200MW Firm and Dispatchable power from ISTS connected Renewable Energy Power Projects coupled with energy storage system on anywhere in India basis under Tariff Based Competitive Bidding (TBCB)-II]
[NH/CCW/CC-III/CO-301 /PR16923/45][2024_NHPC_800202_1]
|
NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC |
44 |
07-Mar-2024 03:00 PM |
21-May-2024 05:30 PM |
27-May-2024 04:00 PM |
[Repair and maintenance of Project Hospital and Incinerator room Helipad at NHPC Teesta V Power station Balutar]
[NH/TSV/Cont/CC-321/NIT-899][2024_NHPC_799335_1]
|
NHPC Limited||Teesta-V Power Station-NHPC |
45 |
07-Mar-2024 11:00 AM |
23-May-2024 05:00 PM |
27-May-2024 03:00 PM |
[Channelization of Seepage in Transformer Cavern, MAT Portal, MIV floor, Platform on GIS floor crane beam of Power House Parbati III Power Station, Behali]
[PR11923/210/1Channelization of Seepage in powerhou][2024_NHPC_798865_1]
|
NHPC Limited||Parbati III Power Station-NHPC |
46 |
06-Mar-2024 11:00 AM |
23-May-2024 05:00 PM |
29-May-2024 03:00 PM |
[Design, supply, erection and commissioning of mono rail for lifting arrangement of Drainage and Dewatering system]
[PR11923/151/1supply erection commission of monorai][2024_NHPC_798857_1]
|
NHPC Limited||Parbati III Power Station-NHPC |
47 |
11-Jan-2024 03:30 PM |
10-Jun-2024 05:30 PM |
13-Jun-2024 11:30 AM |
[Expression of Interest (EOI) From Any Indian / Global Company FOR Empanelment with NHPC Ltd regarding the Development of Offshore Wind Power Projects in India.]
[CC-III/CO-284/PR16923/37 ][2024_NHPC_788618_2]
|
NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC |
48 |
06-Nov-2023 11:30 AM |
18-Jun-2024 02:30 PM |
21-Jun-2024 03:00 PM |
[Package-I Civil Work of Dugar HE Project, 500 MW, Himachal Pradesh, India.]
[NH/CCW/CC-V/CO-270/PR16223/22][2023_NHPC_775644_1]
|
NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC |