| 1. |
21-Nov-2025 09:00 AM |
05-Dec-2025 10:00 AM |
08-Dec-2025 11:30 AM |
[Repair and maintenance work of Psychiatric ward and Dhobi Shop including Bathrooms toilets]
[B.V-4/2025-26-SZ-Works (CH HYD) Minor Work T/027][2025_CRPF_881327_2]
|
DG,CRPF,MHA||South Zone,CRPF,MHA
|
| 2. |
28-Nov-2025 10:00 AM |
05-Dec-2025 10:00 AM |
06-Dec-2025 10:00 AM |
[Installation and operation of Submersible Pump Set for dewatering of Stilling Basin of Spillway]
[THDC/TEHRI/PROC/ LIMITED/2025-26/36][2025_THDC_887438_1]
|
THDC India Limited||Tehri-THDC India Ltd||Planning Department-THDC India Ltd
|
| 3. |
03-Nov-2025 11:00 AM |
05-Dec-2025 10:30 AM |
05-Dec-2025 02:30 PM |
[AU-86857 for supply of non critical lube oil on COLD basis]
[AU-86857 for supply of non critical lube oil on COLD basis][2025_RCFL_883820_1]
|
Rashtriya Chemicals and Fertilizers Ltd.||IT,RCFLTD,MCF
|
| 4. |
26-Nov-2025 12:00 PM |
05-Dec-2025 11:00 AM |
06-Dec-2025 12:00 PM |
[Repair and Maintenance of Residential Quarters Type I No 01 to 10 and Type II No.37 to 62 at 55 BN BSF under SHQ BSF Abohar]
[09/Engg(E)/Tender/SHQ ABR/2025-26][2025_BSF_887137_6]
|
DG,BSF,MHA||Punjab Ftr(Jallundhar),BSF,MHA
|
| 5. |
25-Nov-2025 11:00 AM |
05-Dec-2025 11:00 AM |
06-Dec-2025 11:00 AM |
[Construction of 04 mtrs. width and Approx 172 mtrs. length covered pathway at IIM Lucknow]
[IIML/PROJ/4533/2025 ][2025_IIML_886984_1]
|
Indian Institute of Management Lucknow||Project Section - IIM Lucknow
|
| 6. |
21-Nov-2025 12:00 PM |
05-Dec-2025 11:00 AM |
06-Dec-2025 11:30 AM |
[RATE CONTRACT]
[123/ST/26/SCI(AM)][2025_SCI_883771_1]
|
Supreme Court of India||ADMN. MATERIALS - SCI
|
| 7. |
24-Nov-2025 09:00 AM |
05-Dec-2025 11:00 AM |
08-Dec-2025 11:00 AM |
[Replacement of Fire Alarm System at CH BSF Campus Salbagan under FTR HQ Tripura]
[21/IGA/EE(E)/NIT/2025-26][2025_BSF_886775_1]
|
DG,BSF,MHA||Tripura FTR(Agartala),BSF,MHA
|
| 8. |
14-Nov-2025 11:10 AM |
05-Dec-2025 11:00 AM |
06-Dec-2025 11:30 AM |
[SUBSTRATES FOR ANTENNA FABRICATION]
[NITW/PS-50/G/2872/2025/ Substrates for Antenna Fabrication/ECE][2025_NITW_878814_2]
|
National Institute of Technology Warangal
|
| 9. |
21-Nov-2025 12:00 PM |
05-Dec-2025 11:00 AM |
08-Dec-2025 11:30 AM |
[Crack Opening Displacement Gauge]
[NITW/PS-102/G/3774/2025/Crack Opening Displacement Gauge/CED][2025_NITW_886540_1]
|
National Institute of Technology Warangal||Purchase and Stores Section - NIT Warangal
|
| 10. |
21-Nov-2025 02:00 PM |
05-Dec-2025 11:00 AM |
06-Dec-2025 11:30 AM |
[RASPBERRY Pi5 (16 GB) WITH CORAL USB ACCELERATOR]
[NITW/PS-72/G/3473/2025/ Raspberry Pi5/ECE][2025_NITW_886530_1]
|
National Institute of Technology Warangal
|